FIELD: oil and gas industry.
SUBSTANCE: method for pulse-wave treatment of a productive formation involves excitation in a liquid flow of periodic stalling cavitation. An additional near-axial cavitation cavity is created prior to stalling cavitation by liquid flow swirling. A device for pulse-wave treatment of the productive formation includes inlet and outlet pipelines, a Venturi tube and a resonator. A swirling chamber is installed at the Venturi tube inlet. The resonator is located at the end of the outlet pipelines and it has a straight-flow design in the form of a metal ring with metal rods located parallel to the device axis. With that, the device for pulse-wave treatment of the productive formation is cyclically moved from the roof of the productive formation to the bottom of the formation and back to the roof of the formation.
EFFECT: improving treatment efficiency of a bottom-hole zone of the formation and improving operating reliability of the device.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
TREATMENT METHOD OF CARBONATE AND CARBONATE-CONTAINING FORMATIONS (VERSIONS) | 2009 |
|
RU2425209C2 |
METHOD FOR PERFORMING PULSE HYDRAULIC FRACTURING OF CARBONATE FORMATION | 2011 |
|
RU2460876C1 |
METHOD FOR INHIBITION OF A WELL WITH A SUCKER ROD PUMPING UNIT IN CONDITIONS COMPLICATED BY SCALE DEPOSITION IN DOWNHOLE PUMPING EQUIPMENT | 2022 |
|
RU2786893C1 |
TREATMENT METHOD OF PRODUCTIVE FORMATION, AND DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2010 |
|
RU2478778C2 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506421C1 |
PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION | 2007 |
|
RU2366806C1 |
METHOD OF FORMATION TREATMENT | 2012 |
|
RU2506420C1 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
METHOD OF TREATMENT OF THE NEAR-WELLBORE ZONE | 2022 |
|
RU2797160C1 |
Authors
Dates
2015-10-27—Published
2014-08-11—Filed