FIELD: construction.
SUBSTANCE: invention relates to hydrotechnical and nature protection construction and can be used as anchors in emergency. Method of fixing bank fasteners dams includes wire anchor with tips. Wire anchor is hammered into soil on dam crest, and in places of bend under wire are laid concrete cylindrical units, wire is passed at joint and is fixed to bank attachment of dam.
EFFECT: technical result consists in improvement of efficiency and reliability of reinforcement Bank fasteners dams, reduced labour intensity and material consumption during work.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FIXING FASTENERS OF DAMS AT DOWNSTREAM SLOPE | 2015 |
|
RU2579035C1 |
WIRE ANCHOR WITH SWIVEL TIPS | 2013 |
|
RU2543825C1 |
METHOD OF FLEXIBLE LATERAL BRACING ERECTION | 2006 |
|
RU2334842C1 |
METHOD FOR ERECTING SLIDING SLOPE FASTENING | 2006 |
|
RU2329351C1 |
METHOD FOR FLEXIBLE SLOPE PROTECTIVE STRUCTURE ERECTION | 2004 |
|
RU2278920C1 |
METHOD TO ERECT TILED FIXATION | 2011 |
|
RU2471920C1 |
METHOD FOR BUILDING FLEXIBLE COAST SECURING STRUCTURE | 2003 |
|
RU2238368C1 |
METHOD OF FLEXIBLE PAVING CONSTRUCTION | 2006 |
|
RU2327835C1 |
METHOD OF REINFORCING PILLARS WITH WIRE ANCHORS | 2015 |
|
RU2583440C1 |
METHOD OF MOUNTING PILLARS | 2015 |
|
RU2581172C1 |
Authors
Dates
2016-03-27—Published
2015-02-11—Filed