FIELD: construction.
SUBSTANCE: invention relates to construction and arrangement of environmental landscape, and can be used as mounts for pillars of power lines, arrangement of recreation areas on beaches. Method of mounting columns includes excavation of pit with installation of columns in it. At bottom of rectangular pit there is stacked lining, wire anchors with lugs are hammered ground at corners, after which pit is filled with gravel preparation, which keeps column base with shoe to which corners are attached and tightened wire anchors, and shoe set and post is fixed.
EFFECT: technical result consists in efficiency of mounting columns and reliability of their operation.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REINFORCING PILLARS WITH WIRE ANCHORS | 2015 |
|
RU2583440C1 |
METHOD FOR MOUNTING WIRE TIES AT LARGE DEPTH | 2015 |
|
RU2579034C1 |
METHOD OF FIXING FASTENERS OF DAMS AT DOWNSTREAM SLOPE | 2015 |
|
RU2579035C1 |
METHOD OF SECURING SLOPING ANCHORAGES OF DAM | 2015 |
|
RU2579032C1 |
METHOD OF FLEXIBLE LATERAL BRACING ERECTION | 2006 |
|
RU2334842C1 |
TRANSVERSAL THROUGH BANK-PROTECTION STRUCTURE | 2004 |
|
RU2270292C1 |
METHOD FOR BUILDING FLEXIBLE COAST SECURING STRUCTURE | 2003 |
|
RU2238368C1 |
LONGITUDINAL THROUGH BANK-PROTECTION STRUCTURE | 2004 |
|
RU2270291C1 |
GABION FOUNDATION | 2010 |
|
RU2457294C2 |
METHOD FOR GABION CONSOLIDATION STRUCTURE ERECTION IN WATER STREAM | 2003 |
|
RU2248427C1 |
Authors
Dates
2016-04-20—Published
2015-02-13—Filed