FIELD: construction.
SUBSTANCE: invention relates to construction and nature preservation improvements and may be used as fasteners for columns in emergencies of natural character, as well as for arrangement of recreation zones on beaches. Method to reinforce pillars using wire anchors includes arrangement of pit with installation of columns in it. At that, soil around column are hammered wire anchors with tips to required depth. On column on one or two tiers clamps are fixed, wire is attached to anchor through connection cables, which number in each tier is more than three and angle between them is
EFFECT: technical result consists in increase of rate and efficiency of attachment of columns in emergency situations and reliability of their operation.
4 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOUNTING PILLARS | 2015 |
|
RU2581172C1 |
METHOD OF SECURING SLOPING ANCHORAGES OF DAM | 2015 |
|
RU2579032C1 |
METHOD FOR MOUNTING WIRE TIES AT LARGE DEPTH | 2015 |
|
RU2579034C1 |
METHOD OF FIXING FASTENERS OF DAMS AT DOWNSTREAM SLOPE | 2015 |
|
RU2579035C1 |
METHOD TO CONSTRUCT PROTECTIVE FACILITY AGAINST SPRING FLOODS IN CASE OF EMERGENCIES | 2013 |
|
RU2541631C1 |
WIRE ANCHOR WITH SWIVEL TIPS | 2013 |
|
RU2543825C1 |
PROTECTIVE STRUCTURE AGAINST FLOODS IN CASE OF EMERGENCY SITUATIONS | 2013 |
|
RU2545554C1 |
METHOD OF FLEXIBLE LATERAL BRACING ERECTION | 2006 |
|
RU2334842C1 |
DEVICE FOR INSTALLATION OF WIRE ANCHORS ON SLOPES AND IN RAVINES | 2013 |
|
RU2541964C1 |
WIRE TIE INSTALLATION METHOD | 2013 |
|
RU2543251C1 |
Authors
Dates
2016-05-10—Published
2015-02-16—Filed