FIELD: power engineering.
SUBSTANCE: group of inventions relates to fuel-power complex and can be used for extraction of difficult high-viscosity (bitumen) oil. Method is used for capital mining operations on opening of bitumen oil deposit with the help of shafts and underground mining and development drifts. It is necessary to create from the main and local underground mine-preparatory drifts the channels for access to the productive formation in the form of injection-heating wells for thermal and gas-liquid effect on productive formation. Injection-heating wells are drilled in the upper part and inclined within the thickness of the productive formation; they are equipped with tubular heat exchange devices connected to a device for heating and circulation of the heat-bearing fluid medium. Oil extracted through production wells, drilled in the lower part of the productive formation. Actual mining for well production of bitumen oil is carried out with supply of liquefied propane-butane mixture into circular gaps between perforated casings of injection-heating wells and tubular heat exchange elements of systems for circulation of heat-bearing fluid medium. Dry stripped gas containing mainly methane gas, is supplied, via a shaft gas line to the surface and used as fuel gas at a gas-turbine power plant for generation of electric and heat energy. Besides, dry stripped gas is also used as fuel gas for heating of heat-bearing fluid in circulation systems of injection-heating wells.
EFFECT: technical result: reduced power consumption during exercising thermal effect on productive formation and increased oil recovery.
2 cl, 6 dwg, 5 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING-WELL EXTRACTION SCAVENGER OIL AND PROCESS EQUIPMENT SYSTEM THEREFOR | 2015 |
|
RU2593614C1 |
WELL GAS-TURBINE-NUCLEAR OIL-AND-GAS PRODUCING COMPLEX (PLANT) | 2017 |
|
RU2652909C1 |
METHOD OF MINING-WELL TAR PRODUCTION AND PROCESS EQUIPMENT SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2574434C1 |
METHOD FOR DEVELOPMENT OF SHALE OIL AND GAS BEARING DEPOSITS AND PROCESS SYSTEM OF EQUIPMENT FOR ITS APPLICATION | 2014 |
|
RU2547847C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS WITH LARGE DEPTHS OF PRODUCTIVE HORIZONS AND LOW WELL YIELDS | 2019 |
|
RU2713547C1 |
UNDERGROUND NUCLEAR HYDRO-ACCUMULATING HEAT ELECTRIC STATION (VERSIONS) | 2017 |
|
RU2643668C1 |
DEEP UNDERGROUND PETROLEUM PRODUCTION WITH DIRECTIONAL SHAFTS | 2021 |
|
RU2773391C1 |
METHOD FOR THERMAL ACTION APPLICATION TO HIGHLY-VISCOUS OIL DEPOSIT | 2004 |
|
RU2268356C1 |
METHOD OF DEVELOPMENT OF BITUMEN DEPOSITS OF ISOMETRIC SHAPE | 2012 |
|
RU2524705C2 |
METHOD FOR FRACTURED HIGHLY-VISCOUS OIL RESERVOIR DEVELOPMENT | 2006 |
|
RU2321734C1 |
Authors
Dates
2016-03-27—Published
2015-02-27—Filed