FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises drilling of heat injection wells, injection of heat carrier into bed, drilling of drain holes, well dewatering and product sampling. Note here that drilled heat injection wells feature circular shape. Note also that heat-and-mass transfer occurs via forced convection from heat-injection well. Bed product is extracted via vertical drain-production wells by piston displacement of bitumen and thick oil by superheated high-pressure steam from deposit periphery to vertical drain-production well. Flow density is defined by the formula: P=h(Tf-Ts), where P is heat flow through area unit or interface volume; h is heat emission factor; Tf is fluid flow temperature; Ts is solid phase temperature. Note that heating radius is defined by the formula:
EFFECT: higher yield, control over heat carrier distribution.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT OF ISOMETRIC NATURAL BITUMEN DEPOSITS | 2013 |
|
RU2528760C1 |
METHOD OF DEVELOPMENT OF BITUMINOUS OIL DEPOSIT BY THERMAL ACTION ON FORMATION | 2018 |
|
RU2687833C1 |
METHOD FOR BITUMEN DEPOSIT DEVELOPMENT | 2005 |
|
RU2307926C1 |
METHOD FOR EXTRACTION OF BITUMINOUS DEPOSIT | 2002 |
|
RU2225942C1 |
METHOD OF BITUMEN DEPOSIT DEVELOPMENT | 2009 |
|
RU2395676C1 |
METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289684C1 |
DEVELOPMENT METHOD OF DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2011 |
|
RU2485304C1 |
METHOD FOR MINING-WELL EXTRACTION SCAVENGER OIL AND PROCESS EQUIPMENT SYSTEM THEREFOR | 2015 |
|
RU2593614C1 |
METHOD FOR EXTRACTING HETEROGENEOUS OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287678C1 |
METHOD FOR MINE PRODUCTION-WELLS OF HARD (BITUMINOUS) OIL AND SYSTEM OF EQUIPMENT THEREFOR | 2015 |
|
RU2579061C1 |
Authors
Dates
2014-08-10—Published
2012-10-02—Filed