FIELD: construction.
SUBSTANCE: invention relates to construction. Method for driving piles comprises formation of well filled without sealing with sealing soil and immersion into concrete pipe. Well is formed by punching with pile with a shoe-punch at bottom, over which then form a broadened base of layered backfilled and compacted hard soil material on top of which some sleep without compacting soil material, followed by immersion in it drop reinforced concrete piles and final formation of broadened a base in an upper portion thereof and compacted zone in lower part, and on side surface of a driven pile.
EFFECT: technical result is increasing load-carrying capacity, reducing time and increasing efficiency of use of pile foundations in punched holes.
7 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
PILE IN THE PUNCHED WELL ARRANGEMENT METHOD (EMBODIMENTS) | 2017 |
|
RU2663420C1 |
METHOD OF ARRANGING DRIVEN PILE IN PUNCHED WELL IN WEAK WATER-SATURATED SOILS (VERSIONS) | 2016 |
|
RU2634912C1 |
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE | 2018 |
|
RU2678172C1 |
DRIVING METHOD OF DRIVEN HOLLOW PILE WITH A WIDENED BASE | 2018 |
|
RU2685719C1 |
METHOD OF PILE DRIVE DEVICE | 2014 |
|
RU2601630C2 |
TEST METHOD OF HOLLOW DRIVEN PILE WITH A WIDENED BASE | 2019 |
|
RU2717297C1 |
INSTALLATION METHOD FOR A DRIVING PILE IN A PERFORATED MANTLE PIPE | 2019 |
|
RU2713822C1 |
METHOD OF ARRANGING DRIVEN PILE | 2017 |
|
RU2640467C1 |
METHOD FOR CONSTRUCTION OF CAST-IN-PLACE PILE | 0 |
|
SU1652431A1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
Authors
Dates
2016-04-27—Published
2014-04-30—Filed