FIELD: construction.
SUBSTANCE: invention relates to production of double-layer kauton-concrete girders. Method comprises making concrete of upper layer with frame. After 28 days, after development of concrete strength, kauton bottom layer is made. Contact between layers is strengthened with lugs and cuts. After laying layer of kauton, double-layer element is placed in dry warm-up chamber, where curing process occurs at a temperature of 120±5 °C.
EFFECT: high reliability, durability and strength of beams.
1 cl, 2 tbl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ROAD STRUCTURE | 2005 |
|
RU2340720C2 |
POLYMER-CONCRETE MIXTURE | 2009 |
|
RU2402501C1 |
BRIDGE REINFORCED CONCRETE BEAM | 2012 |
|
RU2507336C1 |
METHOD OF MANUFACTURING REINFORCING CAGE FOR REINFORCED CONCRETE BEAMS | 2016 |
|
RU2638193C1 |
REINFORCING CAGE FOR MULTISPAN REINFORCED CONCRETE BEAMS | 2016 |
|
RU2637668C1 |
COMPOSITE LOW VAULT STRUCTURE AND VAULT ERECTION METHOD | 2003 |
|
RU2254424C1 |
METHOD OF PRODUCING PRESTRAINED BEAM STRUCTURES | 0 |
|
SU1473955A1 |
POLYMER-CONCRETE MIXTURE | 2004 |
|
RU2266876C1 |
COMPOSITION FOR ENCAPSULATION OF RADIOACTIVE AND HIGHLY TOXIC WASTE | 2006 |
|
RU2319677C1 |
PROCESS FOR MANUFACTURING PRESTRESSED CONSTRUCTIONS | 0 |
|
SU1106661A1 |
Authors
Dates
2016-08-10—Published
2014-10-30—Filed