METHOD FOR DETERMINATION OF CORROSION OF CASING STRINGS IN PRODUCTION WELLS Russian patent published in 2016 - IPC G01N27/82 

Abstract RU 2593926 C1

FIELD: oil industry.

SUBSTANCE: invention can be used for control of technical state of oil and gas wells. Present invention consists in that method of determining corrosion of casing strings in producing wells includes measurement of thickness of casing string in well bore by pulse electromagnetic flaw detection, additionally recording amplitude of low-frequency acoustic noise at which are selected intervals of behind-casing flows of liquid, in detected intervals of flows at low values of total EMF of pulses of magnetic permeability and electrical conductivity of casing string determining its thickness and by comparing it with thickness of neighbouring non-overflow interval defined based on absence of acoustic noise, wherein thickness of casing string is lowered only due to corrosion of its inner wall based on difference between said thicknesses corrosion is evaluated on outer side of column.

EFFECT: technological outcome is possibility of determining external corrosion.

1 cl, 2 dwg

Similar patents RU2593926C1

Title Year Author Number
METHOD FOR IDENTIFICATION OF BEHIND-CASING FLOWS AND CASING STRINGS CORROSION ZONES IN PRODUCTION WELLS 2015
  • Nurgaleev Vener Galeevich
  • Urakov Dmitrij Vitalevich
RU2610935C2
METHOD FOR COMPLEX ASSESSMENT OF WELLS CEMENTING QUALITY AND ISOLATION OF RESERVOIR BEDS 2007
  • Zhvachkin Sergej Anatol'Evich
  • Bakanov Jurij Ivanovich
  • Geras'Kin Vadim Georgievich
  • Klimov Vjacheslav Vasil'Evich
  • Sevrjukov Gennadij Alekseevich
  • Kobeleva Nadezhda Ivanovna
  • Chernomashenko Aleksandr Nikolaevich
  • Engibarjan Arkadij Armenovich
  • Zakharov Andrej Aleksandrovich
  • Brazhnikov Andrej Aleksandrovich
  • Retjunskij Sergej Nikolaevich
RU2405936C2
METHOD OF CONTROL OF MOTION OF FORMATION FLUID IN CASING STRING-BOREHOLE ANNULUS OF DEVELOPMENT WELL 1995
  • Ipatov A.I.
RU2078923C1
METHOD FOR INTEGRITY CHECK OF INTERVALS OF CASING STRING FOR INSTALLATION OF CEMENT BRIDGE IN WELLS FOR LIQUIDATION 2017
  • Volkov Maksim Vyacheslavovich
  • Abshenas Mokhammad
RU2702045C2
METHOD FOR CHECKING STATE OF BORE-HOLE CASING 1995
  • Peterson A.Ja.
  • Basarygin Ju.M.
  • Chernenko A.M.
  • Budnikov V.F.
  • Klimov V.V.
  • Mikhed I.M.
  • Retjunskij S.N.
RU2102597C1
PROCEDURE FOR PREVENTION OF BEHIND-CASING FLOW FROM NON PERFORATED FORMATION INTO INTERVAL OF PERFORATION 2009
  • Khisamov Rais Salikhovich
  • Nuriev Il'Jas Akhmatgalievich
  • Evdokimov Aleksandr Mikhajlovich
  • Khusainov Vasil Mukhametovich
  • Gumarov Nafis Faritovich
RU2394987C1
METHOD OF PHYSICAL ABANDONMENT OF WELLS 2014
  • Makarov Dmitrij Nikolaevich
  • Farrakhov Ruslan Mansurovich
  • Muradov Rasim Alievich
  • Tukhvatullin Ramil Ravilevich
RU2576422C1
WELL COMPLETION METHOD 2005
  • Petrov Nikolaj Aleksandrovich
  • Zolotoevskij Vladimir Semenovich
  • Vetland Mikhail Leonidovich
  • Beljaev Vitalij Stepanovich
  • Gazizov Khatim Valievich
RU2304697C1
DIAGNOSTIC METHOD OF CASING STRING-BOREHOLE ANNULUS TIGHTNESS 2006
  • Kiljakov Vladimir Nikolaevich
  • Belousov Gennadij Andreevich
  • Kiljakov Anton Vladimirovich
RU2337239C2
METHOD FOR ASSESSMENT OF CEMENTATION QUALITY OF OIL AND GAS WELLS 2015
  • Khatkov Vitalij Yurevich
  • Maslennikov Vladimir Ivanovich
  • Ivanov Oleg Vitalevich
  • Shulaev Valerij Fedorovich
  • Kuzichkin Nikolaj Aleksandrovich
RU2629724C2

RU 2 593 926 C1

Authors

Nurgaleev Vener Galeevich

Urakov Dmitrij Vitalevich

Dates

2016-08-10Published

2015-04-24Filed