FIELD: aircraft; air conditioning system.
SUBSTANCE: passenger compartment air conditioning system comprises air feed circuit, connecting at least one external air inlet channel with at least one outlet channel distribution of air coming into the compartment. Auxiliary power plant is installed in the above circuit supply to compression of air flow supply circuit. Feed circuit comprises the first discharge of heating, connecting auxiliary power plant with outlet channel of air distribution in which there is apparatus for heating of air flow. Second discharge connects auxiliary power plant with the output of the air distribution and switching device is configured to distribution of air flow between the first outlet of heating and second discharge of cooling.
EFFECT: optimized use of compressed air flow.
10 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
AIR CONDITIONING METHOD AND SYSTEM FOR AIRCRAFT | 2013 |
|
RU2640670C2 |
METHOD AND SYSTEM OF ENERGY RECOVERY IN AIRCRAFT | 2012 |
|
RU2608195C2 |
VEHICLE AND METHOD FOR COOLING OF COMPARTMENT OF SPECIFIED VEHICLE | 2019 |
|
RU2787408C2 |
AIRCRAFT AIR CONDITIONING SYSTEM ON THE BASIS OF ELECTRIC DRIVERS AND REVERSE VAPOR COMPRESSION REFRIGERATING PLANTS | 2017 |
|
RU2658224C1 |
DEVICE AND METHOD FOR SUPPLYING NON-PROPULSIVE POWER FOR AIRCRAFT | 2013 |
|
RU2659860C2 |
METHOD OF OPTIMISING OPERABILITY OF AIRCRAFT ENGINE AND MAIN POWER PLANT TO THIS END | 2011 |
|
RU2607433C2 |
COOLING SYSTEM, AIR CONDITIONING UNIT AND AIR CONDITIONING METHOD | 2019 |
|
RU2711842C1 |
AIR CONDITIONING SYSTEM FOR SUPERSONIC CIVIL AIRCRAFT | 2024 |
|
RU2840887C1 |
METHOD FOR OPTIMISATION OF TOTAL ENERGY EFFICIENCY OF AIRCRAFT AND MAIN POWER GROUP FOR IMPLEMENTATION | 2011 |
|
RU2585394C2 |
AIR PREPARATION SYSTEM FOR INFLATION OF PRESSURE CABIN OF AIRCRAFT BASED ON VAPOR COMPRESSION REFRIGERATION UNITS WITH SECONDARY HEAT CARRIER | 2018 |
|
RU2686609C1 |
Authors
Dates
2016-08-20—Published
2012-05-29—Filed