METHOD OF REDUCING SAND PRODUCTION OF OIL WELLS Russian patent published in 2016 - IPC E21B37/00 E21B43/04 

Abstract RU 2604100 C1

FIELD: oil industry.

SUBSTANCE: invention relates to oil industry and can be used in oil production with sand production in production wells. Method involves well killing. Downhole equipment is removed. Equipment assembly is lowered with "root" on tubing string to sand plug. Sand plug is washed. Tubing string with "root" is removed. Tubing string is lowered into well and packer-plug is installed at depth of 1-2 m below oil-saturated formation interval. Tubing string is disconnected from packer-plug. Tubing string is withdrawn from well. Perforated tubing string of smaller diameter having in its upper part an upper packer is lowered until it rests against packer-plug. Upper packer is unpacked. Flexible pipe is lowered into inner cavity of perforated tubing string. Proppant is pumped through flexible pipe with polymer composition into perforated tubing string by its pressing into annular space between casing and perforated string. Well is held time and cross-linking of proppant is provided. Then well is developed and brought out to operating mode.

EFFECT: technical result is reduction of sand production of oil wells due to creation of downhole anti-sand filter.

1 cl, 3 dwg

Similar patents RU2604100C1

Title Year Author Number
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES 2021
  • Leontev Dmitrii Sergeevich
  • Trifonov Andrei Vladimirovich
RU2774251C1
OIL PRODUCING WELL OPERATION METHOD 2014
  • Ibragimov Nail' Gabdulbarievich
  • Zabbarov Ruslan Gabdelrakibovich
  • Daminov Arslan Mirgajazovich
  • Kozikhin Roman Anatol'Evich
  • Gabbasov Ajrat Khanifovich
  • Sajfutdinov Marat Akhmetzievich
  • Kormukhin Vladimir Aleksandrovich
RU2548271C1
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER 2021
  • Leontev Dmitrii Sergeevich
  • Trifonov Andrei Vladimirovich
  • Kozlov Evgenii Nikolaevich
RU2776018C1
WELL CONSTRUCTION FINISHING METHOD 2011
  • Kejbal Aleksandr Viktorovich
  • Kejbal Anna Aleksandrovna
RU2509875C2
METHOD OF STABILISATION OF PRODUCING FORMATION WITH UNSTABLE ROCKS 2011
  • Nasybullin Arslan Valer'Evich
  • Salimov Oleg Vjacheslavovich
  • Salimov Vjacheslav Gajnanovich
  • Zijatdinov Radik Zjauzjatovich
RU2464410C1
WET GAS OR GAS CONDENSATE WELL RECOVERY METHOD AND ITS DROWNING PREVENTION DURING ITS FURTHER OPERATION 2013
  • Sarkarov Ramidin Akberbubaevich
  • Marinin Valerij Ivanovich
  • Seleznev Vjacheslav Vasil'Evich
  • Koshelev Anatolij Vladimirovich
  • Temirov Velijulla Gamdullaevich
RU2534291C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL 2019
  • Khusainov Ruslan Fargatovich
  • Ismagilov Fanzat Zavdatovich
  • Tabashnikov Roman Alekseevich
RU2708747C1
METHOD HYDRAULIC RESERVOIR FACTORING EXECUTION WITHOUT LIFTING DOWNHOLE ASSEMBLY 2008
  • Ovsjankin Andrej Mikhajlovich
  • Kilin Mikhail Ivanovich
RU2374437C1
WELL REPEATED COMPLETION METHOD USING GRAVEL PACKING 2017
  • Zhuravlev Oleg Nikolaevich
  • Khismetov Tofik Velievich
  • Nebojsha Trajkovich
  • Shajmardanov Anet Fajruzovich
RU2679772C2
METHOD OF PHYSICAL ABANDONMENT OF WELLS 2014
  • Makarov Dmitrij Nikolaevich
  • Farrakhov Ruslan Mansurovich
  • Muradov Rasim Alievich
  • Tukhvatullin Ramil Ravilevich
RU2576422C1

RU 2 604 100 C1

Authors

Leontev Dmitrij Sergeevich

Kustyshev Aleksandr Vasilevich

Kleshchenko Ivan Ivanovich

Zhaparova Darja Vladimirovna

Bakin Dmitrij Aleksandrovich

Gagarina Oksana Valerevna

Dates

2016-12-10Published

2015-11-11Filed