FIELD: pumps.
SUBSTANCE: invention relates to well pumping units, simultaneously operating several facilities. Pump unit for operation of well beds includes tubing string, cable, shank, packer, installed outside shank between beds, and pump to pump out bed products. Unit includes beds switching device, which in case of electric centrifugal pump using is connected to casing, surrounding electric motor together with cable and ending at input module, and in case of bottom-hole pump using is with pump inlet. Formations switching device is connected with one formation via check valve, and with another is via valve with shut-off element in form of rod with seals or seated valve, actuated by electric drive.
EFFECT: technical result consists in increasing of beds oil recovery factor and improvement of unit reliability.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PLANT FOR SIMULTANEOUS-SEPARATE EXTRACTION OF TWO WELL RESERVOIRS | 2015 |
|
RU2588072C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
PUMP ASSEMBLY FOR OPERATION OF BEDS IN WELL | 2011 |
|
RU2498052C2 |
METHOD OF DUAL OIL PRODUCTION FROM LAYERS OF ONE WELL WITH SUBMERSIBLE PUMP SET (VERSIONS) | 2007 |
|
RU2344274C1 |
PUMP UNIT FOR SIMULTANEOUS-SEPARATE EXTRACTION OF FLUID FROM TWO WELL SEAMS (VERSIONS) | 2013 |
|
RU2542071C2 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2546218C1 |
AGGREGATE FOR DUAL BED OPERATION IN WELL | 2014 |
|
RU2550633C1 |
UNIT WITH SCREW PUMPS FOR SIMULTANEOUS AND SEPARATE PRODUCTION OF OIL FROM MULTILAYER WELL | 2019 |
|
RU2732940C1 |
Authors
Dates
2016-12-20—Published
2015-08-31—Filed