FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION Russian patent published in 2014 - IPC E21B34/06 

Abstract RU 2531011 C1

FIELD: oil and gas industry.

SUBSTANCE: method includes a separate running in to the well of a pipe string with packer system, sensor units (when required) to control parameters of the well state, a pilot-controlled electrical or electromechanic valve and downhole wet contact unit connected and disconnected electrically and mechanically. The pilot-controlled electrical valve is intended for opening/closure for delivery of the formation fluid to overpacker area of the well. A separate running in is made for the pipe string in the lower part of the downhole wet contact unit connected and disconnected electrically and mechanically by an electrical line ensuring data transfer from monitoring sensors, supply and transfer of commands to the pilot-controlled electrical or electromechanic valve from the ground station or running in is made for the pipe string equipped with a deep well pump, electric submersion pump or a shank of any other type fixed in the lower part of the pump equipment, or a telemetry unit located under the pumping unit, the upper part of the downhole wet contact unit connected and disconnected electrically and mechanically. The electrical line may be connected at the wellhead by a separate cable line when submersible electric drive (sucker rod pump, free-flow production method, etc.) is not used in the downhole equipment or in composition with the fourth core of the submersible cable for electric pumps up to an electric drive of the pump equipment and then by a separate cable or from the zero point of the submersible motor or from telemetric system of the submersible motor. The shank may be equipped with emergency isolation device. Upon matching of the upper and lower part of the downhole wet contact unit connected and disconnected electrically and mechanically the electrical coupling between the ground station for the formation operational parameters and the pilot-controlled valve is set and in result there is a option to control and measure parameters of the well state and to cut off the formation fluid when maintenance and repair operations are performed for the pumping equipment.

EFFECT: option to perform lifting of the pumping equipment for maintenance and repair without well kill operations.

7 dwg

Similar patents RU2531011C1

Title Year Author Number
METHOD FOR UNDERGROUND WELL REPAIR TO REPLACE SUBMERSIBLE EQUIPMENT AND EXCLUDE INFLUENCE OF WELL-KILLING FLUID ON PRODUCTIVE PLAST 2016
  • Slivka Petr Igorevich
  • Gabdulov Rushan Rafilovich
  • Bajburin Bajras Khamitovich
RU2623750C1
METHOD FOR UNDERGROUND WELL REPAIR FOR REPLACEMENT OF DOWNHOLE PUMPING EQUIPMENT WITHOUT ACTION ON FORMATION 2015
  • Slivka Petr Igorevich
  • Gabdulov Rushan Rafilovich
  • Bajburin Bajras Khamitovich
RU2592903C1
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT 2011
  • Malykhin Igor' Aleksandrovich
  • Vegera Nikolaj Petrovich
  • Maksimov Stanislav Fedorovich
  • Nikishov Vjacheslav Ivanovich
  • Gubaev Jurij Gennad'Evich
  • Smetannikov Anatolij Petrovich
  • Bajkov Vitalij Anvarovich
  • Volkov Vladimir Grigor'Evich
  • Slivka Petr Igorevich
  • Erastov Sergej Anatol'Evich
  • Gabdulov Rushan Rafilovich
RU2500882C9
DEPLETED WELL OPERATION PLANT 2016
  • Slivka Petr Igorevich
  • Gabdulov Rushan Rafilovich
  • Bajburin Bajras Khamitovich
RU2622412C1
PUMP PACKER ASSEMBLY FOR DUAL PUMPING OF TWO BEDS 2012
  • Maslov Vladimir Nikolaevich
  • Danchenko Jurij Valentinovich
  • Khudjakov Denis Alekseevich
  • Mart'Janova Tat'Jana Pavlovna
  • Nikishov Vjacheslav Ivanovich
  • Gubaev Jurij Gennad'Evich
  • Smetannikov Anatolij Petrovich
  • Bajkov Vitalij Anvarovich
  • Volkov Vladimir Grigor'Evich
  • Slivka Petr Igorevich
  • Erastov Sergej Anatol'Evich
  • Gabdulov Rushan Rafilovich
RU2493359C1
UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF FORMATIONS 2018
  • Kosilov Dmitrij Aleksandrovich
  • Klyushin Igor Gennadievich
  • Arzhilovskij Andrej Vladimirovich
  • Garifullin Azat Rifovich
  • Slivka Petr Igorevich
  • Gabdulov Rushan Rafilovich
  • Bajburin Bajras Khamitovich
  • Davletbaev Roman Vadimovich
RU2724084C2
DOWHNOLE PUMP UNIT FOR SIMULTANEOUS AND SEPARATE OPERATION OF TWO FORMATIONS 2012
  • Nikolaev Oleg Sergeevich
  • Nikishov Vjacheslav Ivanovich
  • Gubaev Jurij Gennad'Evich
  • Smetannikov Anatolij Petrovich
  • Bajkov Vitalij Anvarovich
  • Volkov Vladimir Grigor'Evich
  • Slivka Petr Igorevich
  • Erastov Sergej Anatol'Evich
  • Gabdulov Rushan Rafilovich
RU2488689C1
DATA TRANSFER SYSTEM FOR MONITORING OF HYDROCARBON PRODUCTION PROCESS 2012
  • Alimbekov Robert Ibragimovich
  • Engalychev Il'Giz Rafekovich
  • Shulakov Aleksej Sergeevich
  • Nikishov Vjacheslav Ivanovich
  • Timonov Aleksej Vasil'Evich
  • Sergejchev Andrej Valer'Evich
  • Smetannikov Anatolij Petrovich
  • Bajkov Vitalij Anvarovich
  • Volkov Vladimir Grigor'Evich
  • Slivka Petr Igorevich
  • Erastov Sergej Anatol'Evich
  • Gabdulov Rushan Rafilovich
RU2489570C1
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS 2014
  • Malykhin Igor' Aleksandrovich
RU2552555C1
DOWN-HOLE TESTING AND MEASURING COMPLEX AND METHOD FOR ITS INSTALLATION IN HORIZONTAL WELL 2012
  • Nikolaev Oleg Sergeevich
  • Nikishov Vjacheslav Valer'Evich
  • Timonov Aleksej Vasil'Evich
  • Sergejchev Andrej Valer'Evich
  • Smetannikov Anatolij Petrovich
  • Bajkov Vitalij Anvarovich
  • Volkov Vladimir Grigor'Evich
  • Slivka Petr Igorevich
  • Erastov Sergej Anatol'Evich
  • Gabdulov Rushan Rafilovich
RU2487238C1

RU 2 531 011 C1

Authors

Slivka Petr Igorevich

Gabdulov Rushan Rafilovich

Erastov Sergej Anatol'Evich

Dates

2014-10-20Published

2013-05-06Filed