FIELD: chemistry.
SUBSTANCE: method involves selection of test material samples and X-ray fluorescence method of determination of chemical element quantitative content in the selected samples. Prior to jet grouting, a chemical element is selected to be injected into the ground together with the cement grout during jet grouting, cement grout is prepared by mixing in water, and during cement grout preparation, the selected chemical element is introduced into the grout, a grout sample is taken, the grout is injected into the ground under pressure for building structure formation in the ground and slurry pulp extraction, during jet grouting, a sample of jet-grouting slurry is taken, X-ray fluorescence method is used to measure the weight concentration of chemical elements in samples and density of sample materials, volume concentration of the solution in the jet-grouting cement slurry is calculated.
EFFECT: opportunity for fast determination of solution volume concentration in the jet-grouting slurry with sufficient accuracy for monitoring, timely adjustment of the cementing process and improved quality of underground structures.
9 cl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING VOLUME CONCENTRATION OF CEMENT SLURRY IN SOIL-CEMENT PULP DURING JET GROUTING | 2017 |
|
RU2625770C1 |
METHOD FOR DETERMINATION OF CEMENT QUANTITY IN SOIL-CEMENT MATERIAL OF STRUCTURE, MADE BY JET GROUTING | 2017 |
|
RU2633750C1 |
COMPLEX OF EQUIPMENT FOR JET CEMENTATION | 2017 |
|
RU2648751C1 |
METHOD TO DETERMINE QUANTITY OF CEMENT IN SOIL-CEMENT MATERIAL OF STRUCTURE | 2012 |
|
RU2513567C1 |
METHOD TO CONTROL CONSTRUCTION STRUCTURE QUALITY | 2009 |
|
RU2392620C1 |
METHOD TO DETECT STRENGTH OF SOIL-CEMENT PILE | 2014 |
|
RU2556644C1 |
METHOD OF CONSTRUCTING DEEP FOUNDATIONS AND DEEP FOUNDATION | 2017 |
|
RU2698783C2 |
METHOD TO REINFORCE SOILS IN BUILDING FOUNDATIONS AND EARTH BED OF LINEAR STRUCTURES ON PERMAFROST SOILS | 2013 |
|
RU2537437C1 |
METHOD OF BULK SOIL CEMENTATION | 2015 |
|
RU2656656C2 |
METHOD OF IDENTIFICATION AND ELIMINATION OF DEFECTS PRODUCED IN GROUND PILES | 2017 |
|
RU2642760C1 |
Authors
Dates
2017-02-21—Published
2015-10-07—Filed