FIELD: construction.
SUBSTANCE: method of identification and elimination of defects produced in ground piles includes well formation, installation of reinforcement cage in it, laying communication lines, supplying solidifying composition into the well, for example concrete mixture. Before installing the reinforcing cage, the electrodes are fixed on it, and they are connected to the communication lines. After supplying solidifying composition, its electrical conductivity is monitored, and if there are defects is the wellbore, partial pumping of solidifying composition is made, the defect is eliminated, and then solidifying composition is again supplied into the well.
EFFECT: increased reliability of ground piles by providing the ability to control the wellbore continuity and eliminate defects in the production process.
1 tbl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
INJECTION PILE ERECTION METHOD | 2005 |
|
RU2304198C2 |
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
BORED PILE MANUFACTURING METHOD | 2019 |
|
RU2706848C1 |
METHOD OF ERECTING CAST-IN-PLACE PILE | 0 |
|
SU1032104A1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD OF PILE FORMING IN PRELIMINARY FORMED WELL | 2002 |
|
RU2231596C2 |
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL | 2023 |
|
RU2803751C1 |
CONTINUOUS HOLLOW DIE FOR INSTALLATION OF CAST-IN-PLACE PILES BY INDENTATION METHOD AND METHOD OF CAST-IN-PLACE PILE INSTALLATION BY MEANS OF CONTINUOUS HOLLOW DIE FOR CAST-IN-PLACE PILES BY INDENTATION | 2023 |
|
RU2817367C1 |
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING | 2019 |
|
RU2720047C1 |
Authors
Dates
2018-01-25—Published
2017-04-12—Filed