FIELD: construction.
SUBSTANCE: possibility of erecting a prefabricated frame includes the installation of vertical structures, then the assembly of prefabricated hollow core slabs, the installation of reinforcing cages, and the concreting of joints. Before the installation of hollow core slabs in the central part of their span, a spatial block of temporary supports with screw jacks is installed, the slabs are mounted on these supports with gaps above the vertical structures, and spacers are installed between the slabs of adjacent spans, while the temporary spatial supports are dismantled after the spacers between the plates overlapping and homogenization of joints of hollow-core ceilings.
EFFECT: reduced labor costs when installing the frame.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPOSITE FORM OF MULTISTORY BUILDING AND METHOD OF ERECTION THEREOF | 2007 |
|
RU2318099C1 |
BUILDING SKELETON ERECTION METHOD | 1993 |
|
RU2032047C1 |
MULTISTOREY BUILDING FRAME | 2002 |
|
RU2233952C1 |
COMPOSITE MULTI-STORE BUILDING FRAME MADE OF REINFORCED CONCRETE | 2002 |
|
RU2226593C2 |
FRAMEWORK OF MULTISTORIED BUILDING | 1996 |
|
RU2118430C1 |
BUILT-UP-MONOLITHIC REINFORCED-CONCRETE FRAME OF MANY-STORIED BUILDING "KAZAN-100" | 2001 |
|
RU2184816C1 |
FRAMEWORK OF MULTISTORY BUILDING | 1992 |
|
RU2020210C1 |
PRE-STRESSED REINFORCED CONCRETE BUILDING SKELETON | 1999 |
|
RU2166032C1 |
REINFORCED CONCRETE FRAME OF BUILDING WITH PRECAST AND CAST-IN-SITU HIDDEN CROSSBAR | 2007 |
|
RU2357049C1 |
METHOD TO ERECT SITE-CAST SKELETON BUILDING WITH DECORATIVE OUTER FINISH | 2009 |
|
RU2421580C1 |
Authors
Dates
2017-04-27—Published
2015-08-05—Filed