FIELD: construction.
SUBSTANCE: mobile foundation contains the base made in the form of a set of box-shaped elements connected to each other and forming a cavity. Fixing ridges and clamps are made on the top surface of the box-shaped elements. One of the box-shaped elements is connected to the vacuum device that constantly maintains in the cavity a pre-calculated pressure difference between the cavity pressure and the atmospheric pressure. The base is provided with the sealing skirt arranged along the longitudinal part and on one of the butts of each box-like element.
EFFECT: increasing the foundation mobility, the possibility to reliably fix the mobile foundation on almost any surface and to ensure the reliable fastening of the structures installed on it.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DOME STRUCTURE | 2011 |
|
RU2490398C1 |
SUPPORT UNIT FOR BUILDINGS FROM METALLIC CORRUGATED STRUCTURES | 2016 |
|
RU2633019C1 |
QUICK-MOUNTING PNEUMO-FRAMED PROTECTING COVER FOR PROTECTING CAR VEHICLE BODY FROM THE HAIL | 2016 |
|
RU2636627C2 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD OF REPAIRING AND RESTORATION OF PIPES IN THE IMMEDIATE VICINITY OF THEIR PLACE OF OPERATION AND COMPLEX FOR ITS IMPLEMENTATION | 2022 |
|
RU2790751C1 |
PRE-FABRICATED HANGAR BASED ON PNEUMATIC FORMWORK | 2020 |
|
RU2747998C1 |
ARCH AND RING BUILDING AND METHOD FOR THE ERECTION THEREOF | 2021 |
|
RU2779953C1 |
DOUBLE-WALLED VAULTED BUILDING STRUCTURE ERECTION METHOD | 2003 |
|
RU2261959C2 |
METHOD OF ERECTION OF SHELLS ON PNEUMATIC FALSEWORK | 1994 |
|
RU2112120C1 |
HOVERCRAFT | 2012 |
|
RU2518961C1 |
Authors
Dates
2017-04-27—Published
2016-06-07—Filed