INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO LAYERS OF ONE WELL Russian patent published in 2017 - IPC E21B43/14 E21B43/12 

Abstract RU 2618710 C2

FIELD: mining.

SUBSTANCE: installation comprises a centrifugal pump with a receiving module and an electric drive, a packer and an adjusting device that allows fluid bypass of one of the banks to mix bank production before rising to the daylight, moved down into the drive tube on the tubing string. In this case, the adjusting device consists of an electric drive fixed to a submersible pump, a telescopic rod and a screw head. The submersible pump is installed above the packer. A shank with a top funnel is hermetically sealed into the packer. A screw bushing is hermetically sealed in the shank. At the same time, the screw head is partially or completely inserted into the screw bushing, regulating the volume of fluid flow from the lower bank to the behind-the-packer space. The adjustment of the immersion of the screw head into the screw sleeve is provided by the telescopic rod by means of an electric drive powered from the submersible pump cable.

EFFECT: increase of simultaneous-separate operation efficiency of two layers of one well due to fluids mixing regulation smoothness of two layers of one well.

3 cl, 1 dwg

Similar patents RU2618710C2

Title Year Author Number
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO BEDS OF ONE WELL 2016
  • Kupryashina Anastasiya Anatolevna
RU2617733C2
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO LAYERS OF ONE WELL 2016
  • Kupryashina Anastasiya Anatolevna
RU2618713C2
SINGLE PACKER UNIT FOR SIMULTANEOUS-SEPARATE EXTRACTION OF FLUID FROM TWO FORMATIONS OF ONE WELL (VERSIONS) 2015
  • Nikolaev Oleg Sergeevich
RU2591225C2
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
  • Shamilov Faat Takhirovich
RU2515630C1
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS 2014
  • Malykhin Igor' Aleksandrovich
RU2552555C1
PLANT FOR DUAL OPERATION OF MULTIPLE-ZONE WELL WITH TELEMETRY SYSTEM 2012
  • Nikolaev Oleg Sergeevich
RU2512228C1
METHOD OF DUAL OPERATION OF TWO STRATA WITH ONE WELL 2012
  • Nikolaev Oleg Sergeevich
RU2513896C1
METHOD OF DUAL OIL PRODUCTION FROM LAYERS OF ONE WELL WITH SUBMERSIBLE PUMP SET (VERSIONS) 2007
  • Sharifov Makhir Zafar Ogly
  • Leonov Vasilij Aleksandrovich
  • Sokolov Aleksej Nikolaevich
  • Sal'Manov Rashit Gilemovich
  • Azizov Khubali Fatali Ogly
  • Azizov Fatali Khubali Ogly
  • Leonov Il'Ja Vasil'Evich
RU2344274C1
DEEP-WELL PUMPING UNIT FOR OIL PRODUCING (VERSIONS) 2019
  • Nikolaev Oleg Sergeevich
RU2702187C1
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION 2014
  • Nikolaev Oleg Sergeevich
RU2562641C2

RU 2 618 710 C2

Authors

Kupryashina Anastasiya Anatolevna

Dates

2017-05-11Published

2016-04-21Filed