FIELD: oil and gas industry.
SUBSTANCE: method includes placement of a pump unit in the well containing a pipe string, a rod string, two packers, two pumps at that the upper pump is a sucker-rod pump and the lower pump is a submersible one with an electric motor and a cable; start-up of the well and its operation. At that the lower by-pass valves, the lower packer and a safety unit are connected, a telescopic joint without a hollow flexible rod is fixed to the pipe string, then the upper by-pass valves are connected to the installation, then the hollow flexible rod is run-in into the telescopic joint and pipes of less diameter are screwed into it. The pipes are fitted and the string of pipes with less diameter is connected with a cross-over coupling or crossover shoe installed in the perforated pipe; the upper packer is connected; on-off tool is mounted; the installation assembled at the pipe string is run in into the set interval until packers are transferred into an operating position; disconnection is made in the on-off tool and the pipe string is run out. Then the recoverable part of the on-off tool, the submersible pump inside the housing and a set of a by-pass line are run in into the well at the pipe string; the remaining and recoverable parts of the on-off tool are matched and the sucker-rod pump is run in.
EFFECT: increased efficiency of well operation.
10 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO LAYERS OF ONE WELL | 2016 |
|
RU2618710C2 |
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO LAYERS OF ONE WELL | 2016 |
|
RU2618713C2 |
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO BEDS OF ONE WELL | 2016 |
|
RU2617733C2 |
SINGLE PACKER PUMP FACILITY FOR FLUID PRODUCTION FROM TWO WELL FORMATIONS | 2016 |
|
RU2611786C2 |
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION | 2008 |
|
RU2381352C1 |
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2546218C1 |
EQUIPMENT FOR MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE RECEARCH AND PRODUCTION WITH ELECTIRCAL SUBMERSIBLE PUMP (VERSIONS) | 2008 |
|
RU2380522C1 |
SINGLE PACKER UNIT FOR SIMULTANEOUS-SEPARATE EXTRACTION OF FLUID FROM TWO FORMATIONS OF ONE WELL (VERSIONS) | 2015 |
|
RU2591225C2 |
PUMP DEVICE FOR SIMULTANEOUS SEPARATE OPERATION OF TWO BEDS IN A WELL | 2005 |
|
RU2291953C1 |
Authors
Dates
2014-05-20—Published
2012-10-22—Filed