FIELD: technological processes.
SUBSTANCE: matrix is made in the form of a force element made of reinforced concrete hardening under pressure, the working surface of which is made in the form of an insert. Compensation gasket is installed between the insert and the inner matrix surface. Between the working surface of the power element and the workpiece in a vacuum cavity, encapsulating sealing gaskets are mounted. The blasting chamber has a hydraulic chamber disposed between the matrix and the housing to create pressure necessary for concrete hardening.
EFFECT: increased reliability of the blasting chamber.
2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
EXPLOSION CHAMBER FOR WATER EXPLOSIVE FORMING AND METHOD FOR PRODUCING EXPLOSION CHAMBER FOR WATER EXPLOSIVE FORMING | 2020 |
|
RU2743176C1 |
METHOD OF MANUFACTURING PRODUCTS UNDER PRESSURE FROM HIGH-STRENGTH FIBROUS CONCRETE | 2016 |
|
RU2641363C1 |
PRESS-MOLD FOR MAKING CONCRETE, REINFORCED-CONCRETE PRODUCTS AND SIDE-SQUEEZING MECHANISM | 2004 |
|
RU2274547C2 |
METHOD AND DEVICE FOR SHRINKING DEFORMATION PREVENTION IN CAST-IN-PLACE FLOOR STRUCTURES | 2002 |
|
RU2227196C2 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
FIXED FORMWORK SYSTEM FOR LARGE-BLOCK CONSTRUCTION OF BUILDINGS | 2019 |
|
RU2720548C1 |
METHOD TO REDUCE SHRINKING DEFORMATIONS AND DISPLACEMENTS CAUSED BY FORCES IN CAST-IN-PLACE REINFORCED CONCRETE FLOOR PANELS | 2005 |
|
RU2285095C1 |
BUTT-JOINT TO CONNECT REINFORCED CONCRETE CEILING PANEL WITH COLUMN | 2005 |
|
RU2305159C2 |
RETAINED FORMWORK PACKAGE, METHOD OF ITS ASSEMBLY AND METHOD OF CONSTRUCTION OF MONOLITHIC WALLS OF BUILDING AND STRUCTURE IN RETAINED FORMWORK OF MODULAR ELEMENTS | 2013 |
|
RU2561135C2 |
METHOD OF MULTI-STOREY BUILDING LIGHTENED FLOORS INSTALLATION | 2017 |
|
RU2652402C1 |
Authors
Dates
2017-05-16—Published
2015-12-15—Filed