FIELD: engines and pumps.
SUBSTANCE: separation of pumping station into a finite number of elements with the specified probability parameters is carried out in the method and probabilistic modeling with the definition of pumping station supplying distribution law is carried out. Sudden failure rates cleared during current repairs and their repair rates, gradual failure rates cleared during major repairs and their repair rates are taken as the probability parameters of elements. Wherein random event of transition into the failure mode with the gradual failure rates is carried out only if the actual number of elements in the major repair is less than acceptable, and probabilistic modeling is performed by result data processing of the pumping station operation simulation modeling throughout its duration.
EFFECT: expanded operating performances of the method.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PUMP STATION RELIABILITY EVALUATION | 2015 |
|
RU2602295C1 |
METHOD AND DEVICE FOR DETERMINING OPERATIONAL READINESS OF OBJECT OF EQUIPMENT | 2024 |
|
RU2820568C1 |
COMMUNICATION NETWORK SIMULATION METHOD | 2008 |
|
RU2379750C1 |
SYSTEM FOR ASSESSING WASTEWATERS DISCHARGES INTO ENVIRONMENT | 2015 |
|
RU2599331C1 |
SYSTEM FOR DETERMINING PARAMETERS OF RELIABILITY AND REGULAR SUPPLY OF WATER SUPPLY AND WATER DISCHARGE NETWORKS | 2013 |
|
RU2557486C2 |
SYSTEM FOR ESTIMATION AND FORECAST OF DISCHARGES OF WASTE WATER | 2015 |
|
RU2606039C1 |
SYSTEM FOR DETERMINING AND ASSURING PARAMETERS OF RELIABILITY AND REGULAR SUPPLY OF WATER SUPPLY AND WATER DISCHARGE NETWORKS | 2013 |
|
RU2560831C2 |
METHOD OF SIMULATION OF EMERGENCY RESPONSE ACTIVITIES AT AUTOMATICS AND TELEMECHANICS FACILITIES | 2013 |
|
RU2531780C2 |
ARRANGEMENT FOR FORECASTING CONTROL SYSTEM RELIABILITY | 0 |
|
SU615454A1 |
METHOD AND APPARATUS FOR REGISTRATION OF RESOURCE EXHAUSTION OF RAILROAD AUTOMATIC AND TELEMETRY EQUIPMENT | 2020 |
|
RU2753855C1 |
Authors
Dates
2017-05-23—Published
2015-12-03—Filed