FIELD: construction.
SUBSTANCE: carrying capacity of the crossing ice cover is increased by means of steel pipes lowered to the basin bottom through the through openings formed in the ice cover along both sides of the crossing along its entire length, the bottom end of the pipe being made welded and its upper end projecting over the ice surface. The pipes are made of two parts articulated together by a junction in the form of spherical surfaces (a kind of spherical hinge). The lower part of the pipes is installed at the basin bottom vertically, and the upper one - at an angle, the upper part of the pipes being equipped with ice-breaking wedges.
EFFECT: increasing the carrying capacity.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626851C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622956C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626087C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622967C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2642183C2 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626855C1 |
METHOD OF INCREASING CAPACITY OF ICE CAP | 2016 |
|
RU2651665C2 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622959C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2642728C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2642726C1 |
Authors
Dates
2017-06-21—Published
2016-04-22—Filed