FIELD: construction.
SUBSTANCE: construction of a water header with overflow is implemented by means of fencing aquifer reliefs in the grotto zone with a dam. The water is pumped out to the consumer and the intake setpoint is controlled at the pressure increased relative to the sea in the header, which is created due to raising the water level in front of the dam by means of pressure regulators - bypasses.
EFFECT: preventing the possibility of penetration of seawater and a crack filler into the water header by cracks in the rock, which contributes to the improvement of pumped water quality.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INTAKE UNDERGROUND WATERS CROPPING OUT ONTO GROUND SURFACE | 1992 |
|
RU2046168C1 |
METHOD TO INCREASE PRODUCTIVITY OF WATER ABSTRACTION OF UNDERGROUND WATER | 2020 |
|
RU2741081C1 |
MINE DRAINAGE DURING DEVELOPMENT OF SYNCLINAL COAL DEPOSITS BY COMBINED METHOD | 2016 |
|
RU2622972C1 |
METHOD OF GATHERING OIL PRODUCTS FROM CONTAMINATED WATER-BEARING BEDS AND HYDROGEODYNAMIC TRAP FOR OIL PRODUCTS | 1994 |
|
RU2047542C1 |
METHOD OF CLARIFICATION OF PROCESS WATER IN UNDERGROUND DRAINAGE SUPS WITH MECHANIZED TREATMENT | 1998 |
|
RU2162004C2 |
METHOD OF DISTRIBUTED STORAGE AND USE OF GROUND WATERS IN MINE | 2013 |
|
RU2567564C1 |
MINE DRAINAGE IN FLAT AND PITCHING MINING OF COAL DEPOSITS WITH COMBINED METHOD | 2016 |
|
RU2627504C1 |
DRILLING WASTES UNDERGROUND BURIAL | 2013 |
|
RU2529197C1 |
RIVERBED-DIVERSION STRUCTURE OF SEASONAL WATERWAY ON PERMAFROST | 2008 |
|
RU2382139C1 |
HYDRAULIC ENGINEERING STRUCTURE FOR WATER INTAKE FROM SPRING | 2014 |
|
RU2574469C1 |
Authors
Dates
2017-07-03—Published
2016-07-26—Filed