FIELD: measuring equipment.
SUBSTANCE: ground bench consists of a metal bench pipe 1, which within the seasonally thawed layer is made in the form of a tapered truncated cone, which allows a significant reduction in the tangential force of bulging. In the lower part of the pipe anchor 2 is attached, and in the upper part there is a mobile mark 3. A change in the height of the mark 3 is made by the screw thread 4 with fixing the lock nut 5. To rotate the mark along the screw thread, the hexagonal cross-section 6 under the spanner is provided in its upper part. To measure the change in the bench height to the movable mark, a metal ruler 7 with millimetric divisions is attached. The change in the mark height is measured relative to the fixed index 8 welded to the bench pipe 1.
EFFECT: reducing the costs for the bench manufacture and its re-laying, shortening the time for performing measurements and increasing the accuracy of measurements, when observing the altitude of the points.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
GROUND GEODETIC BENCH MARK | 2020 |
|
RU2764875C1 |
SUBSURFACE GEODETIC DATUM FOR SEASONAL EARTH FREEZING REGIONS | 2011 |
|
RU2456545C1 |
DEVICE FOR MONITORING SOIL DEFORMATIONS IN CRYOLITE ZONE | 2020 |
|
RU2739288C1 |
METHOD OF CONTROLLING POSITION OF ABOVE-GROUND PIPELINES UNDER PERMAFROST CONDITIONS | 2014 |
|
RU2582428C2 |
BENCHMARK AND METHOD OF ITS INSTALLATION | 2008 |
|
RU2402748C2 |
0 |
|
SU367339A1 | |
GEODETIC SIGN, THE METHOD FOR ITS RESTORATION AND THE DEVICE FOR THE IMPLEMENTATION OF THIS METHOD | 2021 |
|
RU2778206C1 |
DATUM MARK | 0 |
|
SU1286901A1 |
METHOD OF DETERMINING DEFORMATIONS OF PILE SUPPORTS OF PIPELINE USING NAVIGATION SATELLITE SYSTEMS | 2023 |
|
RU2821670C1 |
POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND | 2006 |
|
RU2317375C2 |
Authors
Dates
2017-07-06—Published
2016-06-06—Filed