FIELD: transportation.
SUBSTANCE: traverse is lowered down and installed on the technological stand. A new rope and technological halyon is unwound on the site. Removing the clamping elements connecting the old rope with the traverse. Its ends are connected with a new rope and technological halyard. The lifting mechanism of the crane is a new rope and technological halyard along a given route through all movable and immovable block blocks. At the top, a new rope and technological halyard are connected to each other and attached to the crane structures. On the drum, the clamps holding the old rope are removed and the crane lifting mechanism is pushed down. Installing a technological unit in the threaded hole of one of the released clamps. Connected new rope and technological halyard free from attachment to the structure of the crane, are entered into the stream of the technological block. Then manually or with the help of the power device a new rope is made along the whole path. As a power device, the lifting mechanism of the crane is used, securing the technological unit to the truck and installing an additional technological unit on the traverse.
EFFECT: reduced labour intensity.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPLACEMENT A STEEL ROPE AT HOISTING CRANE | 2018 |
|
RU2702326C1 |
METHOD OF REPLACING CLIMBING CRANE CABLE | 2011 |
|
RU2476368C2 |
METHOD OF REPLACING LIFTING CRANE CABLE | 2015 |
|
RU2598704C1 |
ARRANGEMENT FOR ERECTING VERTICAL STRUCTURES | 0 |
|
SU992401A1 |
GANTRY CRANE FOR HYDRAULIC STRUCTURE CLOSURE | 0 |
|
SU1428683A2 |
TRAVELLING GANTRY CRANE FOR HYDRAULIC GATE | 0 |
|
SU1312059A2 |
PIPE-LAYING CRANE | 2017 |
|
RU2676998C1 |
GANTRY CRANE FOR CONTROLLING HYDRAULIC STRUCTURE GATE | 0 |
|
SU1084234A1 |
OVERHEAD TRAVELLING CRANE | 0 |
|
SU1312057A1 |
LOAD-LIFTING CRANE TROLLEY | 2005 |
|
RU2288163C1 |
Authors
Dates
2017-08-31—Published
2015-10-07—Filed