WELL FOR DEVELOPMENT OF OIL FORMATION Russian patent published in 2017 - IPC E21B43/20 

Abstract RU 2630830 C1

FIELD: oil and gas industry.

SUBSTANCE: well for development of oil formation comprises vertical and lateral columns, a tubing string (tubing) for pumping a displacement agent into a production formation, and equipment for lifting oil to a wellhead. The well is configured with h-shaped profile. The diversion point of the lateral column from the well vertical part is taken at 300-500 m distance from the production oil formation. The distance from the lateral column entry point to the production oil formation, up to the point where the well vertical part enters said formation, is taken 200-600 m for injecting the displacement agent into one area of the production oil formation and extracting oil from another formation area. The upper part of the tubing string for injecting the displacement agent is located in the vertical wellbore. The lower part of said column is located in the lateral wellbore and packed above the production oil formation. The second tubing string with a deep pumping unit is located in the vertical wellbore. The pumping unit is placed at required height above the production oil formation under condition of bottomhole pressure reduction and oil extraction increase.

EFFECT: improved development efficiency of oil formation area with minimised operating costs for construction and operation of wells.

1 dwg

Similar patents RU2630830C1

Title Year Author Number
METHOD FOR DETERMINING WATER CONTENT OF BOREHOLE OIL 2016
  • Zejgman Yurij Veniaminovich
  • Denislamov Ildar Zafirovich
  • Tokareva Nadezhda Mikhajlovna
  • Kamaltdinov Alfred Rafailovich
RU2637672C1
OIL WELL DEEP PUMP EQUIPMENT OPERATION METHOD 2016
  • Denislamov Ildar Zafirovich
  • Zejgman Yurij Veniaminovich
  • Kamaltdinov Alfred Rafailovich
RU2645196C1
METHOD OF OIL FORMATION DEVELOPMENT 2016
  • Denislamov Ildar Zafirovich
  • Sitdikova Dinara Fajruzovna
  • Yarmukhametov Ruslan Radikovich
  • Muslimov Artur Rustemovich
RU2622418C1
METHOD OF DEVELOPING OIL RESERVOIR 2015
  • Denislamov Ildar Zafirovich
  • Enikeev Ruslan Marselevich
  • Ishbaev Rustam Rauilevich
  • Denislamova Gulnur Ildarovna
RU2580330C1
MULTIFUNCTIONAL WELL FOR EXTRACTION OF HIGH-VISCOSITY OIL 2018
  • Denislamov Ildar Zafirovich
RU2688821C1
METHOD FOR BOREHOLE PRODUCTION OF HIGH-VISCOSITY OIL 2020
  • Denislamov Ildar Zafirovich
  • Ishbaev Rustam Rauilevich
  • Ishbaev Ramil Rauilevich
  • Abyzbaev Nikita Ibragimovich
RU2752304C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT 2017
  • Ponomarev Aleksandr Iosifovich
  • Denislamov Ildar Zafirovich
  • Ishbaev Rustam Rauilevich
RU2646902C1
METHOD OF DETERMINATION OF DEPOSIT VOLUME IN TUBING STRING 2015
  • Zejgman Yurij Veniaminovich
  • Denislamov Ildar Zafirovich
  • Enikeev Ruslan Marselevich
RU2610948C1
METHOD OF WELL DEVELOPMENT OF OIL RESERVOIR AREA 2015
  • Denislamov Ildar Zafirovich
  • Ponomarev Aleksandr Iosifovich
  • Isaev Ilfir Zufarovich
  • Denislamova Gulnur Ildarovna
RU2594027C1
METHOD OF LIQUID LEVEL DETERMINATION IN WATER SUPPLY WELL 2016
  • Zejgman Yurij Veniaminovich
  • Denislamov Ildar Zafirovich
  • Denislamova Gulnur Ildarovna
RU2623756C1

RU 2 630 830 C1

Authors

Zejgman Yurij Veniaminovich

Denislamov Ildar Zafirovich

Tokareva Nadezhda Mikhajlovna

Akhmetzyanov Eduard Radikovich

Dates

2017-09-13Published

2016-03-22Filed