DEVICE AND METHOD OF EXAMINATION OF HORIZONTAL OR INCLINED WELL Russian patent published in 2017 - IPC E21B47/01 

Abstract RU 2632605 C1

FIELD: oil and gas industry.

SUBSTANCE: group of inventions relates to equipment for investigation and completion of inclined and horizontal wells equipped with arrangements for performing multi-stage hydraulic fracturing of the formation. The device has a tubing string, a pumping unit, a packer, means for well measuring parameters and at least one sealing element contacting the casing string walls. An electric centrifugal pump unit of inverted type with telemetering system unit is used as a pumping unit. The telemetering system unit is lowered into the tubing string on load-carrying cable and placed in horizontal or inclined well under examination. A sealing element is installed outside the tubing string outside of electric centrifugal pump unit. The method includes preliminary running of tubing string into casing string with passage of horizontal or inclined well, lowering of electric centrifugal pump on load-carrying cable and placing of electric centrifugal pump inside the tubing string with the telemetering system unit connected thereto in examined area with subsequent step-by-stage movement thereof along the well, pumping of liquid with simultaneous measurement of parameters at each stage and processing the obtained results.

EFFECT: improved reliability and accuracy of measurement of flow parameters, pressure, temperature and water content providing possibility for examining long sections of horizontal wells.

4 cl, 2 dwg

Similar patents RU2632605C1

Title Year Author Number
WELL COMPLETION METHOD 2017
  • Lebedev Dmitrij Nikolaevich
  • Peshcherenko Sergej Nikolaevich
RU2654086C1
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) 2014
  • Savich Anatolij Danilovich
  • Chernykh Irina Aleksandrovna
  • Shadrunov Anton Anatol'Evich
  • Shumilov Aleksandr Vladimirovich
RU2571790C1
METHOD FOR DEVELOPMENT AND OPERATION OF A WELL AFTER ACID TREATMENT OF AN OIL RESERVOIR 2022
  • Lysenkov Aleksej Vladimirovich
  • Denislamov Ildar Zafirovich
  • Zejgman Yurij Veniaminovich
  • Imamutdinova Adelina Altafovna
  • Allenov Anatolij Nikolaevich
  • Kamaleeva Lejsan Linarovna
RU2783928C1
METHOD OF OIL FORMATION DEVELOPMENT 2016
  • Denislamov Ildar Zafirovich
  • Sitdikova Dinara Fajruzovna
  • Yarmukhametov Ruslan Radikovich
  • Muslimov Artur Rustemovich
RU2622418C1
SUBMERSIBLE PUMP UNIT ON LOAD CARRYING CABLE AND METHOD OF ITS OPERATION 2020
  • Ostrovskij Viktor Georgievich
  • Musinskij Artem Nikolaevich
  • Yurov Oleg Borisovich
  • Peshcherenko Marina Petrovna
  • Barutkin Vladislav Nikolaevich
  • Perelman Maksim Olegovich
  • Poshvin Evgenij Vyacheslavovich
RU2737409C1
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) 2010
  • Vakhrushev Andrej Anatol'Evich
  • Khajnovskij Jurij Nikolaevich
  • Vasilenko Petr Vladimirovich
  • Tatarintsev Andrej Anatol'Evich
RU2471065C2
METHOD OF ELECTRIC CENTRIFUGAL PUMP INSTALLATION ON LOAD CARRYING CABLE (VERSIONS) 2020
  • Ostrovskij Viktor Georgievich
  • Gorbunov Dmitrij Valerevich
  • Poshvin Evgenij Vyacheslavovich
  • Perelman Maksim Olegovich
RU2738875C1
DEVICE AND METHOD FOR SELECTIVE TREATMENT OF A PRODUCTIVE FORMATION 2020
  • Kuzyaev Salavat Anatolevich
RU2747495C1
GARIPOV WELL PUMP PACKER INSTALLATION 2010
  • Garipov Oleg Marsovich
  • Bagrov Oleg Viktorovich
  • Mustafin Ehdvin Lenarovich
  • Garipov Maksim Olegovich
RU2439374C1
UNIVERSAL MULTIFUNCTIONAL DEVICE BASED ON PLUG-IN HYDRAULIC JET EJECTOR PUMP FOR OIL FIELD OPERATIONS 2024
  • Shubenok Dmitrij Sergeevich
RU2828936C1

RU 2 632 605 C1

Authors

Poshvin Evgenij Vyacheslavovich

Lebedev Dmitrij Nikolaevich

Dates

2017-10-06Published

2016-08-25Filed