SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) Russian patent published in 2015 - IPC E21B43/11 

Abstract RU 2571790 C1

FIELD: mining.

SUBSTANCE: in compliance with claimed process, cumulative perforator is lowered to the productive stratum interval. Electrically-driven rotary pump is lowered into the well on oil-well tubing. Depression of the stratum and perforator injection are performed. Note here that said cumulative perforator provided with geophysical instrument with the transducers of pressure, temperature and fluid properties, gamma-ray logging unit and couplings locator are lowered on geophysical cable to the secondary exposure interval. Said electrically-driven rotary pump unit fitted at oil-well tubing is provided with protective centralizer, current conducting cable and geophysical cable to be displaced there over for referencing to cumulative perforator geological section by displacement of the perforator and instrument over the borehole. The latter allow the measurement of depression developed by the pump and remote measurement of the face pressure and fluid composition. At intermittent registration of said parameters as the depth function, casing section is subjected to diagnostics during the entire MTBR. MTBR period expired, the equipment suspended from the oil-well tubing and cable are withdrawn from the borehole.

EFFECT: simplified secondary exposure, higher quality of productive strata.

3 cl, 2 dwg

Similar patents RU2571790C1

Title Year Author Number
METHOD OF WELL SURVEYING ON DEPRESSION PRIOR TO BEGINNING OF PRODUCTION, AND DEVICE FOR ITS IMPLEMENTATION 2009
  • Pasechnik Mikhail Petrovich
  • Kovalev Valerij Ivanovich
  • Sviridenko Anatolij Dmitrievich
  • Belous Viktor Borisovich
  • Molchanov Evgenij Petrovich
  • Korjakov Anatolij Stepanovich
RU2399759C1
WELL COMPLETION METHOD 2017
  • Lebedev Dmitrij Nikolaevich
  • Peshcherenko Sergej Nikolaevich
RU2654086C1
CUMULATIVE PUNCH 0
  • Bulda Yurij Anatolevich
  • Krivenok Vyacheslav Illarionovich
  • Turov Nikolaj Ivanovich
  • Biskaliev Yusup Dyusengalievich
SU1771508A3
SIMULATED COMPLETION METHOD FOR GAS WELL PRODUCTIVE FORMATIONS 2013
  • Glazkov Igor' Mikhajlovich
  • Abaturov Sergej Vladimirovich
RU2517250C1
GEAR TO PERFORATE WELLS UNDER DEPRESSION 1999
  • Enikeev M.D.
  • Khakimov V.S.
RU2169833C1
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS 2001
  • Lytkin A.Eh.
  • Shlein G.A.
  • Gazimov R.R.
  • Safiullin R.I.
  • Prokhorov N.N.
  • Brilliant L.S.
RU2179631C1
METHOD OF AND PLANT FOR OPERATING JET UNIT AT HYDRAULIC FRACTURING OF FORMATION 2004
  • Khominets Zinovij Dmitrievich
RU2263236C1
METHOD OF OPERATION OF WELL PUMPING UNIT AT WELL COMPLETION AND WELL PUMPING UNIT FOR METHOD EMBODIMENT 2001
  • Khominets Zinovij Dmitrievich
RU2189504C1
METHOD AND DEVICE FOR GAS-HYDRODYNAMIC FRACTURING OF PRODUCTIVE FORMATIONS FOR DEVELOPMENT OF PROBLEMATIC RESERVES (VARIANTS) 2010
  • Korzhenevskij Arnol'D Gennad'Evich
  • Korzhenevskij Andrej Arnol'Dovich
  • Korzhenevskaja Tat'Jana Arnol'Dovna
  • Korzhenevskij Aleksej Arnol'Dovich
RU2442887C1
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF 2006
  • Shlein Gennadij Andreevich
  • Kuznetsov Jurij Alekseevich
  • Gornostaev Sergej Gennad'Evich
  • Kotov Taras Aleksandrovich
RU2345214C2

RU 2 571 790 C1

Authors

Savich Anatolij Danilovich

Chernykh Irina Aleksandrovna

Shadrunov Anton Anatol'Evich

Shumilov Aleksandr Vladimirovich

Dates

2015-12-20Published

2014-04-18Filed