FIELD: technological processes.
SUBSTANCE: after joining the edges of pipe billet, the tack weld is made by arc welding. Main working weld is applied with the melting of the tack weld by laser or laser-arc welding. Then, inner and outer facing welds are performed by arc welding. Before the main working weld is made, the pipe billet is lifted to a fixed position by means of a drive mechanism connected to the control unit, on the input value of which the value of the angle of pipe billet inclination is entered. By means of driving support rollers, arranged to position and rotate the pipe billet by 360°, the joint of the edges of pipe billet is set to the position for 12 hours. Main working seam is made on the rise. Then pipe billets are lowered and either external face weld on the descent, without changing the position of joints of the edges of pipe billet, or inner face weld on the downhill is made, tentatively setting the joints of edges of pipe billet at 6 o'clock position.
EFFECT: increase of reliability of welded seam.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYBRID LASER-ARC WELDING OF STEEL THICK-WALLED STRUCTURES | 2018 |
|
RU2679858C1 |
METHOD OF DEFECT-FREE HYBRID LASER-ARC WELDING OF THICK-WALL BUTT JOINTS | 2018 |
|
RU2697754C1 |
METHOD OF WELDING LARGE-DIAMETER PIPES | 2018 |
|
RU2697530C1 |
MILL FOR ASSEMBLING AND WELDING LONGITUDINAL WELDED PIPES | 2017 |
|
RU2667272C1 |
METHOD OF DEFECT-FREE HYBRID LASER-ARC WELDING OF THIN-WALL BUTT JOINTS | 2018 |
|
RU2697756C1 |
METHOD OF PIPE LASER WELDING | 2017 |
|
RU2637034C1 |
LASER WELDING OF LARGE-DIAMETER TUBES | 2014 |
|
RU2564504C1 |
METHOD FOR HYBRID LASER-ARC WELDING OF THICK-WALL PIPES | 2022 |
|
RU2787195C1 |
MULTI-LAYER PIPE WELDING METHOD | 2013 |
|
RU2511191C1 |
METHOD OF LARGE-DIAMETER PIPES WELDING BY LASER AND HYBRID LASER-ARC WELDING | 2015 |
|
RU2609609C2 |
Authors
Dates
2017-12-26—Published
2017-01-31—Filed