FIELD: heating system.
SUBSTANCE: heat supply system includes the hot water boiler with the main flue with the sliding gate and attached to it the bypass flue with sliding gate on the inlet and outlet, which has consistently attached to return heat system pipeline, condensing the heat exchanger with the input and output pipes and the water economizer fitted with interconnected irrigating ditch and tray. At that the heat pump is installed on the return pipeline, connected to the heat system boiler, the evaporator and condenser of which are connected to the inlet and outlet pipes of the condensing heat exchanger, respectively. And the low-temperature heat system circuits with floor heat panels are additionally connected to the return pipeline of the heat system according to the dependent scheme.
EFFECT: return heat system water temperature reduction, entering the condensing heat exchanger, which provides useful utilisation of the large amount of heat due to the water vapor condensation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
CONDENSATION BOILER PLANT (VERSIONS) | 2012 |
|
RU2489643C1 |
BOILER HOUSE | 2023 |
|
RU2798634C1 |
THERMAL POWER STATION WITH ORC-MODULE CIRCUIT AND WITH HEAT PUMP AND METHOD OF ITS WORK | 2015 |
|
RU2662259C2 |
BOILER HOUSE | 2022 |
|
RU2815593C2 |
OPERATING METHOD OF HOT-WATER BOILER | 2019 |
|
RU2716202C1 |
COMBINED HEATING AND HOT WATER SUPPLY SYSTEM WITH DEEP WASTE DISPOSAL OF BOILER COMBUSTION PRODUCTS AND METHOD FOR OPERATION THEREOF | 2017 |
|
RU2667456C1 |
METHOD FOR HEAT EXTRACTION FROM GAS-FIRED BOILER AND STEAM BOILER IMPLEMENTING IT | 1999 |
|
RU2159894C2 |
HEATING AND COOLING SYSTEM USING AN ABSORPTION THERMAL TRANSFORMER | 2022 |
|
RU2789804C1 |
HEAT AND COOLING SUPPLY METHOD USING ABSORPTION THERMO-TRANSFORMER | 2022 |
|
RU2790909C1 |
BOILER PLANT OPERATION METHOD | 2014 |
|
RU2556478C1 |
Authors
Dates
2018-01-22—Published
2017-01-09—Filed