FIELD: power engineering.
SUBSTANCE: condensation boiler plant includes a steam boiler with main and bypass gas ducts, a water economiser (WE), a condensation heat-exchanger-heat recovery boiler of combustion products heat (CHEHR), a smoke exhaust and a stack, and also a surface heat exchanger (HE), a thermal feedwater deaerator (DA) with a nozzle of flash steam discharge into the main gas duct, a contact heat-exchanger-humidifier of blow air (AH), connected to the DA, a surface heat-exchanger-heat recovery boiler of fuel combustion products (HEHR), installed upstream the CHEHR, and an absorption lithium bromide heat pump (ALBP), the evaporator of which with the CHEHR and HEHR create a circulation circuit of cooling medium.
EFFECT: invention makes it possible to increase efficiency of a boiler plant, to expand area of application of deep heat recovery and to reduce content of hazardous nitrogen oxides in discharge products of gas fuel combustion.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
HEAT SUPPLY SYSTEM | 2017 |
|
RU2641880C1 |
HEATING AND COOLING SYSTEM USING AN ABSORPTION THERMAL TRANSFORMER | 2022 |
|
RU2789804C1 |
HEAT AND COOLING SUPPLY METHOD USING ABSORPTION THERMO-TRANSFORMER | 2022 |
|
RU2790909C1 |
BOILER PLANT | 1998 |
|
RU2148206C1 |
TPP FLUE GASES HEAT AND CONDENSATE UTILIZER | 2015 |
|
RU2610355C1 |
BOILER PLANT OPERATION METHOD | 2014 |
|
RU2556478C1 |
BOILER PLANT OPERATION MODE | 2014 |
|
RU2565948C1 |
OPERATING METHOD FOR THE BOILER INSTALLATION | 2021 |
|
RU2777997C1 |
METHOD OF BOILER PLANT WORK | 2016 |
|
RU2620611C1 |
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT | 2016 |
|
RU2631961C1 |
Authors
Dates
2013-08-10—Published
2012-05-10—Filed