FIELD: construction.
SUBSTANCE: invention relates to public construction. Method comprises forming an anti-corrosion coating and heat insulation on pipeline (3), laying said pipeline in trench (2), followed by filling the trench with soil. Heat insulation on pipeline (3) with an anti-corrosion coating is formed after placing it in trench (2) by filling it with layer of sand (4) up to 2 times diameter (d) of pipeline (3) and wetting said layer using a known method with an aqueous salt solution of given concentration and subsequent filling of the final trench with soil (5).
EFFECT: improved heat-shielding properties of the pipeline in the trench from the effect of drop in sub-zero temperatures.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DRYING FLOODED CLOSED DEPRESSIONS | 2023 |
|
RU2816530C1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERGROUND PIPE LINE | 2001 |
|
RU2196269C2 |
METHOD FOR FOUNDATION PROTECTION AGAINST FROST HEAVES | 2005 |
|
RU2301304C1 |
METHOD FOR PRODUCTION OF HUMUS FROM VEGETABLE WASTES AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2695460C1 |
STORM SEWER SYSTEM FOR MELT WATER DRAINAGE FROM ROADWAY | 2018 |
|
RU2689541C1 |
METHOD FOR CONSTRUCTION OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES, ENGINEERING EQUIPMENT AND COMPLEX OF OBJECTS FOR PRODUCTION AND TRANSPORTATION OF GAS AND METHOD OF OPERATION AND/OR REPAIR, AND/OR RECONSTRUCTION, AND/OR REBUILDING OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES AND ENGINEERING EQUIPMENT | 1995 |
|
RU2053432C1 |
0 |
|
SU1784795A1 | |
PIPELINE ROUTING METHOD | 2014 |
|
RU2559222C1 |
ARTIFICAL TRENCH FOR MAIN PIPELINE, METHOD OF ITS BASE CONSTRUCTION (VERSIONS), BASE (VERSIONS), AND DEVICE FOR BASE CONSTRUCTION | 2007 |
|
RU2340824C1 |
Authors
Dates
2018-01-24—Published
2017-03-30—Filed