FIELD: construction.
SUBSTANCE: method of strengthening a foundation includes drilling a well, installing a pipe-injector, and pumping a fixing composition. After installing the pipe-injector, along the lateral surface of the two foundation sides and into the previously performed well, through which the injection has already been carried out, electrodes are immersed. A powder additive of an electrically conductive material is introduced into the fixing material, and while pumping the fixing composition, electrical resistance of the foundation body is measured between the pipe-injector and each of the electrodes.
EFFECT: increasing the reliability of the injection fixing of the foundation stone masonry due to ensuring the possibility of quality control during the production process.
1 tbl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO RECOVER CONTACT LAYER "FOUNDATION - SOIL BASE" | 2015 |
|
RU2572477C1 |
METHOD OF FIXING AND ENHANCING THE CARRYING CAPACITY OF WET FINE GRAIN SOILS OF RUNNING TYPE UNDER BASES AND FOUNDATIONS OF BUILDINGS AND STRUCTURES | 2015 |
|
RU2594495C1 |
METHOD FOR INJECTION FIXATION AND REINFORCEMENT OF BASES OF FOUNDATIONS OF DEFORMED AND RECONSTRUCTED BUILDINGS AND STRUCTURES, CARRIED OUT BY IMPREGNATING WATER-SATURATED SOILS USING LOW-VISCOSITY HIGH-PENETRATING GELLING HARDENING SOLUTION BASED ON SILICA SOL AND ORGANOSILICON COMPOSITIONS | 2024 |
|
RU2824786C1 |
METHOD OF LIFTING AND LEVELING OF BUILDINGS/CONSTRUCTIONS | 2016 |
|
RU2643396C1 |
MANUFACTURING METHOD OF INCLINED PILE WITH CONTROLLED WIDENING | 2012 |
|
RU2522358C1 |
METHOD FOR REINFORCEMENT OF PILE FOUNDATION | 2019 |
|
RU2728052C1 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
METHOD OF MAKING A ROOT PILE WITH CONTROLLED BROADENING | 2015 |
|
RU2605474C2 |
METHOD FOR REINFORCEMENT OF PILE FOUNDATION | 2019 |
|
RU2722901C1 |
METHOD OF SOIL REINFORCEMENT | 2010 |
|
RU2439246C1 |
Authors
Dates
2018-01-25—Published
2017-03-10—Filed