FIELD: construction.
SUBSTANCE: method for depth compensation compaction of soil in construction of underground object by means of compensation compaction of soil at the side of secured structure near constructed underground object, where at the side of secured structure zones of easy-to-compact soil are detected in depth of soil mass before decompaction spreads towards secured structure by the distance critical for secured structure, hardening material is supplied into detected zones of easy-to-compact soil under hydrostatic pressure, and serially (by turns) in each detected zone of easy-to-compact soil along mass depth, depth compensation compaction of soil is carried out in specified zones by discrete dynamic pulses until soil compaction is rejected, adding hardening material, if required.
EFFECT: increased reliability, quality and manufacturability of anti-deformation barrier formation, reduced labour intensiveness of works for provision of integrity of buildings located in zone covered by works of deep pit arrangement, with minimum consumption of resources and maximum possible usage of soil mass properties.
19 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MANUFACTURING OF FOUNDATION FROM BORING PILES | 2009 |
|
RU2403341C1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245428C2 |
METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE | 2022 |
|
RU2800171C1 |
METHOD FOR EXISTENT BUILDING, BUILDING STRUCTURE AND UNDERGROUND SERVICE LINE PROTECTION IN CONSTRUCTION AFFECTED ZONE | 2005 |
|
RU2291253C1 |
METHOD OF EXISTING BUILDINGS AND CONSTRUCTIONS PROTECTION | 2006 |
|
RU2328577C2 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245966C2 |
METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS | 2019 |
|
RU2715784C1 |
METHOD FOR REDUCING SETTLEMENT OF BUILDINGS DURING CONSTRUCTION OF UNDERGROUND WORKINGS UNDER THEM | 2020 |
|
RU2749003C1 |
PROCESS OF ERECTION OF ENCLOSING WALL IN GROUND | 2001 |
|
RU2204656C1 |
METHOD TO MAINTAIN INITIAL STRESSED-DEFORMED CONDITION OF SOIL IN ZONE OF EXISTING BUILDING FOUNDATION | 2010 |
|
RU2422592C1 |
Authors
Dates
2010-12-10—Published
2009-04-30—Filed