FIELD: construction.
SUBSTANCE: invention relates to the construction, operation and repair of pipelines transporting gas, oil and other products and can be used when laying an underground pipeline in a wetland area on type I swamp. Proposed method involves the development of a narrow trench with a special ground cutting machine in a vertical plane up to 2 m deep, and with plowing devices in a horizontal plane with a width of up to 0.5 m. Then the ballasted pipeline is dragged into the trench by traction means and pipe-laying machines. Ballasting of the pipeline prevents it from ascending. Pipeline is equipped with a plug and a cone-shaped device for opening the trench. When swelling the soil while dragging the pipeline, the soil is loosened by a bulldozer or excavator.
EFFECT: technical result consists in reducing the laboriousness of work during the laying of the pipeline, increasing the reliability of its operation.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TRENCH FREE LAYING PIPELINES | 1991 |
|
RU2029827C1 |
METHOD OF LAYING UNDERWATER PIPE-LINE | 0 |
|
SU1423852A1 |
PLOUGH DEVICE FOR DIGGING UNDERWATER TRENCH | 0 |
|
SU1491970A1 |
MEANS FOR DISPLACEMENT OF ARTICLE | 0 |
|
SU1716003A1 |
METHOD OF LAYING OF SUBSURFACE HUMIDIFIERS | 2019 |
|
RU2719785C1 |
PIPELINE PULLING METHOD | 2023 |
|
RU2822166C1 |
METHOD AND DEVICE FOR LAYING UNDERGROUND PIPELINE | 2006 |
|
RU2322629C1 |
TRENCHLESS PIPELINE REPAIR METHOD | 2022 |
|
RU2786612C1 |
DEVICE FOR LAYING UNDERWATER PIPELINE | 0 |
|
SU1573102A1 |
METHOD OF LAYING PIPE-LINE WITH NEGATIVE BUOYNCY | 0 |
|
SU1427141A1 |
Authors
Dates
2018-05-21—Published
2017-04-04—Filed