BARRIER TESTING METHOD Russian patent published in 2018 - IPC E21B47/10 E21B33/127 E21B43/10 

Abstract RU 2660704 C2

FIELD: soil or rock drilling; mining.

SUBSTANCE: group of inventions relates to a well completion system prior to commencement of production and, in particular, barrier testing for testing a production casing in a borehole. Method comprises connecting the drill pipe to the first end of a first production casing having annular barriers. Said barriers comprise a tubular part forming part of the casing and an expandable sleeve surrounding the tubular part, thereby defining an expandable space. Drill pipe and the first production casing are inserted into an intermediate casing extending in a first part of the borehole closest to the top of the well and at least part of the first production casing into a second part of the borehole. Second end of the first production casing is sealed. Pressure inside first production casing is raised and one or more of the expandable sleeves of the annular barriers is expanded to abut a wall of the borehole. Pressure inside first production casing is raised to a predetermined pressure. First production casing and one or more expanded barriers are tested after expansion by measuring if the predetermined pressure is kept constant during a predetermined time period. First barrier packer is installed between the first production casing and the intermediate casing. First barrier packer is tested for its function as a barrier to ensure the overall integrity of the borehole.

EFFECT: technical result is the improvement of barrier testing to ensure the integrity of the borehole.

17 cl, 11 dwg

Similar patents RU2660704C2

Title Year Author Number
PRESSURE INTEGRITY TESTING SYSTEM 2012
  • Khallunbek Jergen
  • Khejzel Pol
RU2605854C2
WELL SYSTEM AND WELL FINISHING METHOD 2014
  • Khejzel Pol
RU2663840C2
DOWNHOLE IN-FLOW PRODUCTION LIMITING APPARATUS 2018
  • Kumar Satish
RU2756805C1
TOOL FOR OVERHAUL OF WELL, WELL SYSTEM CONTAINING TOOL FOR OVERHAUL OF WELL, AND METHOD FOR REPAIRING EQUIPMENT FOR COMPLETION OF WELL 2019
  • Kruger Christian
RU2810258C2
COMPLETION OF WELL 2011
  • Hallundbaek Jorden
  • Hazel Paul
RU2606479C2
WELL COMPLETION METHOD AND WELL COMPLETION SYSTEM 2019
  • Kraemer Jon
RU2804472C2
WELL COMPLETION 2011
  • Khallunbek Jergen
  • Khejzel Pol
RU2719852C2
ANNULAR BARRIER WITH EXPANSION DETECTION DEVICE 2012
  • Khallunbek Jergen
  • Khejzel Pol
RU2606474C2
WELL STRING FOR DRILLING THROUGH LOW PRESSURE ZONE 2015
  • Khejzel Pol
RU2712903C2
ANNULAR BARRIER AND WELL SYSTEM FOR LOW PRESSURE ZONE 2017
  • Vaskis Rikardu Revis
RU2728157C2

RU 2 660 704 C2

Authors

Khallunbek Jergen

Vaskis Rikardu Revis

Khejzel Pol

Dates

2018-07-09Published

2013-10-30Filed