FIELD: transport machinery.
SUBSTANCE: invention refers to the field of pipeline transport and is intended for temporary overlapping of the pipeline section, in particular, during repair works. Method for temporarily closing the gas pipeline is carried out by pumping the curable polyurethane foam composition therein, the composition contains the particulate material in the amount of 20–50 wt % of the polyurethane foam composition. Porophore-foaming agent with the high gas number is used as the dispersed material, it is decomposed at the temperature of 140–200 °C.
EFFECT: proposed method ensures reliable sealing of the gas pipeline, and the polyurethane sealing plug is easily removed after the completion of repair and restoration works without clogging the gas distribution mechanisms.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPOSITION FOR TEMPORARY SEALING DEVICE USED FOR HOT WORKS ON SMALL-DIAMETER GAS PIPE | 2016 |
|
RU2641820C2 |
METHOD FOR CONDUCTING REPAIRS IN PIPELINE USING TEMPORARY CLOSURES (VERSIONS) AND HERMITIC PACKER FOR TEMPORARY PIPELINE SHUTDOWN | 2007 |
|
RU2341721C1 |
METHOD OF TEMPORARY CLOSING OF PIPELINE | 0 |
|
SU708108A1 |
METHOD OF TEMPORARY PIPING SHUT-OFF | 0 |
|
SU1707417A1 |
METHOD FOR CLOSING PIPELINE INTERIOR | 0 |
|
SU1702067A1 |
METHOD OF PRODUCING COMPOSITION FOR SEALING PLUGS IN PIPELINES | 0 |
|
SU1596171A1 |
METHOD OF SEALING-UP PIPE LINES | 1993 |
|
RU2076262C1 |
METHOD OF KILLING OF DEEP AND ULTRADEEP WELLS AND PIPELINES | 1992 |
|
RU2100567C1 |
DEVICE FOR FIXING A STOPPER IN A GAS PIPELINE | 2023 |
|
RU2801410C1 |
FIRE-RETARDANT POLYMER COMPOSITION | 2010 |
|
RU2425086C1 |
Authors
Dates
2018-07-13—Published
2016-12-20—Filed