FIELD: oil and gas industry.
SUBSTANCE: described composition for a temporary sealing device used for hot works performance on a small-diameter gas pipe, contains oil-containing bitumen, rosin, petroleum oil and filler, and porophore blowing agent with decomposition temperature of not above 100°C is used as filler at the following ratio of components, wt %: bitumen 10-80; porophore blowing agent 5-80; rosin 0.5-14.5; petroleum oil 0.5-9.5.
EFFECT: production of a sealing plug that withstands gas pressure drop.
2 tbl, 6 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TEMPORARY OVERLAPPING OF THE GAS PIPELINE | 2016 |
|
RU2661229C2 |
METHOD FOR SAFE INSTALLATION AND REMOVAL OF A TEMPORARY SEALING DEVICE FROM THE GAS PIPELINE CAVITY | 2021 |
|
RU2780392C1 |
METHOD FOR REPAIRING EMERGENCY SECTION OF GAS PIPELINE | 2016 |
|
RU2638895C2 |
METHOD OF MANUFACTURING HOLLOW MICROSPHERES | 1998 |
|
RU2138521C1 |
DEVICE FOR FIXING A STOPPER IN A GAS PIPELINE | 2023 |
|
RU2801410C1 |
POWDERED COATING COMPOSITION | 0 |
|
SU834054A1 |
SAFETY CONTROL IN REPAIR AT MAIN PIPELINES AND SYSTEM TO THIS END | 2011 |
|
RU2484361C1 |
METHOD OF SEALING-UP PIPE LINE | 1995 |
|
RU2122149C1 |
PROTECTIVE COATING OF STEEL PIPELINE AGAINST UNDERGROUND CORROSION | 2021 |
|
RU2760783C1 |
METHOD FOR REPAIRMENT OF MAIN GAS PIPELINE AND MOVABLE INSTALLATION FOR ITS IMPLEMENTATION | 2020 |
|
RU2785882C2 |
Authors
Dates
2018-01-22—Published
2016-12-20—Filed