FIELD: oil and gas industry.
SUBSTANCE: invention relates to geophysical engineering, in particular for the oil and gas industry. Complex device for the study of high-temperature wells contains a main body with sensors of gamma-ray, coupler locator, pressure and temperature sensor placed sequentially from top to bottom with a working range up to +175 °C, as well as the lower body, connected to the main body by a high-temperature geophysical cable, with a temperature sensor located in it with a working range of up to +300 °C.
EFFECT: invention can be used to study oil and gas wells and allows to ensure the reliability of the measuring instruments of standard temperature performance in high-temperature wells, due to the possibility of controlling the temperature in the zone of location of devices with a sharp increase in temperature in the zone of injection of fuel and oxidizing composition into the reservoir.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINATION OF LEAKAGE AND CUT-OFF PLACE OF EXTRACTING COLUMN | 2008 |
|
RU2375565C1 |
COMPLEX DEVICE FOR WELL SURVEYING | 2016 |
|
RU2672073C2 |
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) | 2014 |
|
RU2571790C1 |
METHOD FOR MONITORING NEAR WELLBORE PAYZONE REGION TREATMENT IN WELL AND DEVICE THEREFOR | 2006 |
|
RU2332563C1 |
DEVICE FOR LOGGING WELLS ENCASED IN METAL COLUMN | 2011 |
|
RU2488852C1 |
DEVICE FOR CONTROLLING EXCAVATION AND OPERATION OF A GAS WELL | 2002 |
|
RU2230903C2 |
DEVICE FOR LOGGING WELLS CASED WITH METAL STRING | 2011 |
|
RU2630991C1 |
COMPREHENSIVE WELL INSTRUMENT | 2005 |
|
RU2292571C1 |
METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 |
|
RU2576422C1 |
METHOD AND DEVICE FOR RECOVERY OF HORIZONTAL WELL PRODUCTION AND EFFECT ON FORMATION | 2017 |
|
RU2640846C1 |
Authors
Dates
2018-12-04—Published
2018-02-21—Filed