FIELD: oil industry.
SUBSTANCE: invention relates to the oil industry and can be used when cleaning the filtration zone of a horizontal well with abnormally low formation pressure. Method comprises lowering a flexible pipe (FP) into a well at the level of a liquid, pumping an air-nitrogen mixture through it until the well fluid is completely replaced with gas, sequentially lowering the flexible pipe to the bottom, and simultaneously pumping a flushing fluid with an air-nitrogen mixture into the well. At the same time, after the FP is lowered at 20 m below the level of the fluid in the well, the flushing fluid is pumped through the flexible pipe simultaneously with the air-nitrogen mixture until it comes out and circulates from the well. Next, the FP is lowered to the beginning of the filter and, with a steady flow of fluid from the well, continue to descend to the bottom of the well at a constant speed of 0.015–0.5 m/s and maintaining a stable output of flushing fluid with an air-nitrogen mixture from the well. Then suspend the injection process and raise the FP to the initial depth of descent. Repeat the operation of washing the well and lifting the FP until the end of the removal of mechanical impurities to the surface.
EFFECT: technical result is an increase in the cleaning efficiency of the filtration zone of the well and the elimination of emergency situations due to the absence of fixed pipes in the well.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR TREATMENT OF FILTRATION ZONE OF HORIZONTAL WELL WITH ABNORMALLY LOW RESERVOIR PRESSURE | 2010 |
|
RU2435952C1 |
METHOD OF REDUCING WELL REPAIR DURATION WITH INSTALLATION OF THE FLEXIBLE PIPE | 2017 |
|
RU2670795C9 |
METHOD OF PROTECTION AGAINST SAND PHENOMENA IN WELL | 2009 |
|
RU2410528C1 |
METHOD OF PROPPANT WASHING FROM PIPE STRING AND BOTTOM-HOLE ZONE AFTER RESERVOIR FRACTURE | 2016 |
|
RU2626495C1 |
METHOD FOR CLEANING AND TREATING BOTTOMHOLE ZONE OF HORIZONTAL WELL IN BITUMEN DEPOSIT | 2016 |
|
RU2630938C1 |
SET OF WORKS TO NORMALIZE EQUAL BORE SECTION OF INNER DIAMETER OF ADDITIONAL PRODUCTION STRINGS OF DIRECTIONAL AND HORIZONTAL WELLS | 2020 |
|
RU2747238C1 |
METHOD FOR REMOVING SAND-CLAY PLUG IN WELL AND ITS DEVELOPMENT UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2013 |
|
RU2544944C2 |
METHOD FOR SHUTOFF OF STRATAL WATER INFLUX | 2013 |
|
RU2534373C1 |
RECOVERING METHOD OF WORKING CONDITION OF GAS-OIL PRODUCTION WELL WITH HORIZONTAL AND/OR SUBHORIZONTAL END DURING OPERATION, AND TECHNOLOGICAL COMPLEX FOR METHOD'S IMPLEMENTATION | 2011 |
|
RU2482268C1 |
METHOD FOR DEVELOPING WELL AFTER HYDRAULIC FRACTURING | 2016 |
|
RU2630930C1 |
Authors
Dates
2019-02-12—Published
2017-10-13—Filed