FIELD: mining.
SUBSTANCE: invention relates to field development facilities. Initial data are generated. Centers for collecting products of wells (CC) are placed on a map of cluster sites (CS). Forming a "heat" map of production volumes in form of color gradient filling of the map of the CS in accordance with the initial data on the production volume from each CS, determining the coordinates of the point of maximum production volume, in which the first CC is located, after which all CS, located from CC at a distance of not more than Rmax, is assigned to said CC. Forming a network of communication corridors connecting CC with CS, wherein designing a primary network of corridors of communications, including pipelines. Diameters of pipelines are determined at each section of the constructed network, for which the pressure value at the inlet of the CC and the pressure value at the CS are set, the maximum pressure drop gradient, from which the preliminary pressure values are determined at all points of the network connection, which provide a pressure drop gradient from the CS to the CC of not more than maximum, after that, taking into account known production profile, as well as known CS input sequence, recommended diameters of pipelines are determined on each section of network.
EFFECT: improving design accuracy of field development facilities.
7 cl, 1 tbl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM OF INTEGRATED CONCEPTUAL DESIGN OF HYDROCARBON FIELDS | 2017 |
|
RU2670801C9 |
METHOD AND COMPUTER SYSTEM FOR DESIGNING LOCATION OF CLUSTER SITES IN DEPOSITS | 2017 |
|
RU2685005C1 |
DEVELOPMENT METHOD OF MULTI-OBJECT OIL DEPOSIT (VERSIONS) | 2018 |
|
RU2696690C1 |
METHOD OF SELECTING DEPOSIT DEVELOPMENT SYSTEM | 2018 |
|
RU2692369C1 |
METHOD OF DEVELOPING OIL DEPOSITS AND BLOCK COMPLEX SYSTEM OF PLANTS FOR METHOD EMBODIMENT | 1999 |
|
RU2189439C2 |
TECHNIQUE TO DRIVE DIRECTIONALLY INCLINED BOREHOLES | 1998 |
|
RU2157445C2 |
METHOD FOR DEVELOPING FRACTURED-CAVERNOSIC DEPOSIT WITH GAS CAP AND UNDERLYING WATER | 2022 |
|
RU2808627C1 |
SETUP METHOD OF OIL WELL CLUSTER, AND DEVICE FOR OIL COLLECTION AND TRANSPORT OF OIL WELL CLUSTER | 2011 |
|
RU2482265C2 |
METHOD FOR PREPARATION AND TRANSPORTATION OF PRODUCTS OF WELL PRODUCTION AT MATURE OIL DEPOSITS AND SYSTEM OF IMPLEMENTATION | 2018 |
|
RU2690465C1 |
MOBILE SYSTEM FOR EXTRACTION OF NATURAL WATERS AND HYDROCARBONS, METHOD OF ITS DEPLOYMENT AND APPLICATION | 2023 |
|
RU2823388C1 |
Authors
Dates
2019-04-09—Published
2017-12-08—Filed