METHOD FOR MAINTAINING RESERVOIR PRESSURE OF AN OIL WELL Russian patent published in 2019 - IPC E21B43/00 

Abstract RU 2684791 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to the oil and gas industry, and in particular to methods for extracting oil from boreholes by creating a secondary pressure in a reservoir to displace oil and maintain reservoir pressure using a gas injected into the formation. Method involves the extraction of products from a gas well with an abnormally high pressure drilled to the Achimovsky oil horizon. Products are fed by means of cross-type Christmas tree to a gas treatment facility. Gas prepared in an inlet separator of the facility is injected into the reservoir through the Christmas tree of an injection well for a reservoir pressure maintenance system. Injection well is part of the same cluster as the well drilled in the Achimovsky oil horizon. At the same time, further preparation of the unclaimed part of the gas well production is carried out. To do this, the production is sent to a low-temperature separator and a heat exchanger. After that, the production enters a system of natural pressure gaslift of oilfield to maintain pressure in it.

EFFECT: higher efficiency of oil production.

1 cl, 4 dwg

Similar patents RU2684791C1

Title Year Author Number
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION 2020
  • Poushev Andrei Viktorovich
  • Iazkov Aleksei Viktorovich
RU2756650C1
METHOD FOR COMBINED PRODUCTION OF OIL OF MULTI-LAYER DEPOSITS 2020
  • Kovalev Adolf Appolonovich
  • Kovalev Yurij Adolfovich
RU2740973C1
METHOD OF DEVELOPING OIL DEPOSITS AND BLOCK COMPLEX SYSTEM OF PLANTS FOR METHOD EMBODIMENT 1999
  • Timashev A.T.
  • Gabdrakhmanov N.Kh.
  • Timasheva A.A.
  • Khamidullin F.Kh.
RU2189439C2
METHOD FOR OPERATION OF A GROUP OF OIL PRODUCING WELLS AND PLANT FOR ITS EMBODIMENT 1995
  • Shajkhulov Zh.S.
  • Ageev V.G.
  • Pjatkin N.N.
RU2070277C1
METHOD FOR EXTRACTING OF OIL FROM GAS WELLS WITH OIL-BEARING DEPOSITS 2000
  • Smirnov V.S.
  • Peremyshtsev Ju.A.
  • Turenkov N.A.
  • Kucherov G.G.
  • Jakupov Z.G.
  • Salikhov Z.S.
RU2232877C2
METHOD FOR STUDY OF PRODUCING FORMATION IN NATURAL PRESSURE GAS-LIFT WELL OPERATION 1993
  • Basniev Kaplan Saferbievich[Ru]
  • Zajtsev Igor' Jur'Evich[Ru]
  • Tverkovkin Mikhail Vladimirovich[Ru]
  • Osipov Al'Bert Nikolaevich[Ru]
  • Tegispaev Anatolij Urengalievich[Kz]
  • Komarov Jurij Nikolaevich[Kz]
RU2067171C1
GAS-LIFT WELL OPERATION METHOD 0
  • Pashaev Nadir Gadzhiaga Ogly
  • Abasov Salekh Mirdamed Ogly
SU1758215A1
EQUIPMENT FOR GAS-LIFT METHOD OF OIL PRODUCTION 2000
  • Maksutov R.A.
  • Martynov V.N.
  • Musaverov R.Kh.
  • Isangulov A.K.
RU2168614C1
OIL AND GAS DEPOSIT DEVELOPMENT METHOD 2001
  • Buslaev V.F.
  • Vdovenko V.L.
  • Nor A.V.
  • Judin V.M.
  • Pjatibrat V.P.
RU2260681C2
METHOD OF DEVELOPMENT OF GAS-AND-OIL RESERVOIRS 2013
  • Timchuk Aleksandr Stanislavovich
  • Ivantsov Nikolaj Nikolaevich
RU2547530C1

RU 2 684 791 C1

Authors

Aleksandrov Vyacheslav Vladimirovich

Simonov Sergej Vladimirovich

Malkov Rostislav Vladimirovich

Dates

2019-04-15Published

2018-06-14Filed