FIELD: monitoring systems.
SUBSTANCE: group of inventions relates to a method of monitoring a longwall shearing mining machine in a longwall mining system, wherein the shearing mining machine includes a shearer having a first cutter drum and a second cutter drum, and a monitoring device for a longwall mining system. Method comprises receiving, by a processor, shearer position data including information obtained from sensors regarding at least one of a group consisting of a position of the shearer, a position of the first cutter drum, and a position of the second cutter drum. Identifying, by the processor, from the shearer position data, profile data obtained over a current shear cycle. Analysing the profile data, by means of the processor, to determine if a positioning failure occurred during the shear cycle, based on whether the profile data was within normal operating parameters during the shear cycle. Generating an alert after determining that a positioning failure has occurred during the shear cycle.
EFFECT: higher efficiency of coal mining.
22 cl, 29 dwg
Title | Year | Author | Number |
---|---|---|---|
LEVEL MONITORING FOR LONGWALL METHOD SYSTEM | 2015 |
|
RU2719854C2 |
HORIZON MONITORING FOR CONTINUOUS DEVELOPMENT SYSTEM | 2020 |
|
RU2734806C1 |
HORIZON MONITORING FOR CONTINUOUS DEVELOPMENT SYSTEM | 2020 |
|
RU2748987C1 |
PANORAMIC CHANGE OF INCLINATION IN LONG-LASTING CUT-THROUGH SYSTEM | 2015 |
|
RU2705665C2 |
CUTTER | 1990 |
|
RU2046186C1 |
ADAPTIVE CONTROL OF LONGITUDINAL ROLL IN SYSTEM OF DEVELOPMENT WITH LONG BOTTOMHOLE | 2018 |
|
RU2754899C2 |
SZIELD FOR ENTRY DRIVING OF UNDERGROUND WINNING FACES | 0 |
|
SU1243634A3 |
MONITORING OF ROOF FASTENING IN SOLID DEVELOPMENT SYSTEM | 2015 |
|
RU2691793C2 |
MONITORING OF ROOF FIXATION IN CONTINUOUS DEVELOPMENT SYSTEM | 2015 |
|
RU2718447C2 |
SYSTEM AND METHOD OF OPERATION OF MANAGING THE LONG FACE MINING SYSTEM BASED ON THE MINING PROFILE WITH A FORWARD VIEW | 2020 |
|
RU2750248C1 |
Authors
Dates
2019-07-24—Published
2015-08-27—Filed