METHOD OF INCREASING OIL RECOVERY OF FORMATIONS AND INTENSIFICATION OF OIL PRODUCTION AND SYSTEM FOR ITS IMPLEMENTATION Russian patent published in 2019 - IPC E21B7/06 E21B29/06 E21B43/11 E21B43/16 

Abstract RU 2703064 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil industry, namely to methods of increasing oil recovery of formations, intensification of oil production and stimulation of wells by creating channels in oil formations and devices for their implementation. Method includes installation in well of high-strength tubing, diverter with internal channel passing in it, binding and its possible orientation in space in the interval of lower level of sidetracking, sealing of well mouth, milling windows for each side barrel, installation of downhole equipment consisting of jet nozzle, control unit of trajectory of the shaft, navigation system, working flexible tubing string, flow redistribution device, check valve, flexible tubing supply pipe, liquid supply into tubing annulus / supply tubing, movement of the jet nozzle through the sealing device, through the deflector into contact with the rock, the planned extension of the offshoot, wherein the trajectory of the barrel is determined and varied by means of the barrel and navigation equipment control unit to ensure the barrel wiring along the project trajectory, after driving of the working flexible tubing with the nozzle for the sidetracks wiring at the next levels, the supply and working flexible tubing string are removed from the well, the tubing string is torn off from the mechanical anchor, withdrawing the tubing pipe fitting, preset and equal to the transition length to the next level, washing the well to complete removal of slurry, by actuation of mechanical rotary device deflector is transferred to another plane, tubing is forced on mechanical anchor, working flexible tubing string with downhole equipment is lowered into well, after which work on radial shafts is repeated. When milling windows in casing string cutter is lowered into well on flexible shaft and all projecting windows are cut in one its lowering, after which cutter is lifted; during sidetracking, the current position of the borehole in the formation and the position of the jet nozzle are monitored in real time, using as a navigation equipment a device for tracking the position of the nozzle with a sensor unit connected to the control unit of the borehole trajectory and the jet nozzle; after well flushing, geophysical survey of bottomhole formation zone is carried out by means of additionally introduced into composition of downhole equipment of instruments survey of geophysical properties of rock; transmitting information to ground equipment is carried out by means of a navigation system in the form of current conducting cores built into walls of supply and working flexible tubing string; according to the results of the obtained information, the offshoot is corrected along the project trajectory.

EFFECT: technical result is higher efficiency of oil recovery of reservoirs and intensification of oil production.

2 cl, 3 dwg

Similar patents RU2703064C1

Title Year Author Number
METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH WATER JET 2016
  • Popov Pavel Ivanovich
RU2642194C2
METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH HYDRAULIC MONITOR AT PRESSURE DRAWDOWN 2016
  • Popov Pavel Ivanovich
RU2632836C1
METHOD OF THE CASED WELL PROBE PERFORATION 2015
  • Fursin Sergej Georgievich
RU2668620C2
METHOD FOR CONSTRUCTION OF MULTI-HOLE WELL IN UNSTABLE RESERVOIRS 2024
  • Fursin Sergei Georgievich
  • Gneush Vladislav Sergeevich
  • Al-Idrisi Mokhammed Salekh Abdullakh Khaled
RU2825795C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES 2010
  • Ramazanov Rashit Gaznavievich
  • Bakirov Il'Shat Mukhametovich
  • Zijatdinov Radik Zjauzjatovich
  • Strakhov Dmitrij Vital'Evich
  • Osnos Vladimir Borisovich
RU2442883C1
ASSEMBLY OF BOTTOM OF DRILL STRING FOR DRILLING OF OFFSHOOTS FROM HORIZONTAL PART OF UNCASED WELL 2019
  • Ziyatdinov Radik Zyauzyatovich
RU2715482C1
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS 2008
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
  • Asadullin Marat Fagimovich
RU2363839C1
SET OF ASSEMBLIES FOR INCREASING THE FILTRATION AREA OF ​​THE BOTTOMHOLE ZONE OF AN OPEN HORIZONTAL WELL 2021
  • Ziiatdinov Radik Ziauziatovich
RU2771371C1
METHOD OF DRILLING AND DEVELOPMENT OF OFFSHOOT FROM HORIZONTAL WELL (VERSIONS) 2019
  • Makhmutov Ilgizar Khasimovich
  • Ziyatdinov Radik Zyauzyatovich
RU2709262C1
ASSEMBLY OF DRILL STRING BOTTOM FOR DRILLING OF OFFSHOOTS FROM HORIZONTAL PART OF UNCASED WELL 2019
  • Ziyatdinov Radik Zyauzyatovich
RU2719875C1

RU 2 703 064 C1

Authors

Krivoshchekov Sergej Nikolaevich

Kochnev Aleksandr Aleksandrovich

Vyatkin Kirill Andreevich

Dates

2019-10-15Published

2019-02-07Filed