FIELD: mining.
SUBSTANCE: invention relates to mining industry and can be used in development of potassium deposits. Passing panel workings, block preparatory workings, mating upper and lower formation with ventilation well, cleaning chambers pass at an angle to block preparatory mine workings. Chambers are driven by blind end face with the help of cutter-loader. One block preparatory development with length of not more than 400 m passes along each formation. Continuous delivery systems are used for ore transportation.
EFFECT: invention makes it possible to pass minimum number of preparatory developments and to reduce terms of preparatory works due to reduction of length of extraction unit and use of means ensuring continuous delivery to panel openings.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CHAMBER MINING WHEN PREPARING HORIZONS | 2016 |
|
RU2627803C1 |
METHOD OF PREPARATION OF BEDDED DEPOSITS FOR ROOM MINING SYSTEM WITH RETREATING | 2001 |
|
RU2211332C1 |
METHOD OF UNDERGROUND MINING OF MINERAL DEPOSIT SEAMS | 0 |
|
SU861607A1 |
METHOD OF BLOCK PREPARATION AND PRIFILING OF THE CONTIGUOUS FLAT SYLVINITE LAYERS BY CHAMBERS | 2014 |
|
RU2552270C1 |
METHOD OF PREPARATION AND MINING CONTIGUOUS FLAT SEAMS | 2013 |
|
RU2530102C1 |
METHOD OF PREPARING SEAM DEPOSITS TO CHAMBER-MINING WITH INTERMEDIATE MINERAL STORAGE | 0 |
|
SU1254158A1 |
DEVELOPMENT METHOD OF STRATIFIED DEPOSITS USING CHAMBER SYSTEM | 2011 |
|
RU2479720C1 |
METHOD FOR PREPARATION OF BEDDED DEPOSITS TO REVERSE ORDER OF MINING WHEN IMMEDIATE ROOF ROCK IS UNSTABLE | 2009 |
|
RU2398965C1 |
METHOD FOR BED PREPARATION WITH STABLE ROCK IN IMMEDIATE BACK | 2016 |
|
RU2636992C1 |
METHOD OF MINING BED MINERAL DEPOSITS | 0 |
|
SU1752957A1 |
Authors
Dates
2019-12-17—Published
2019-03-06—Filed