FIELD: mining industry.
SUBSTANCE: invention can be used in underground development of potassium deposits. Method for preparation and development of extraction block or panel with diagonal chambers, consisting in the fact that the opening of the section of the mine field begins with the driving of additional exploration drifts along the upper developed formation by paired faces for 1.5 years before the beginning of mining operations for the entire length of the block or panel, allowing to perform a complex of works on additional study of the mined mineral mass. After 1.5 years after driving of exploration drifts, a stope block or panel is opened. Then conveyor and transport drifts are passed, in which, when the length is sufficient for mounting the flexible and elongated conveyors, geological exploration and geophysical investigations are carried out for the next unit or panel. After completion of works on additional study, flexible and elongated conveyors are mounted. Further, the block or panel is developed along the upper bed, during which further additional study of the developed massif is carried out for the next block or panel.
EFFECT: development of preparation and development of extraction block or panel with diagonal chambers with minimum number of development workings, reduction of time for carrying out preparatory works due to use of facilities providing continuous delivery to panel workings, as well as reduction of terms of performance of all necessary works on additional exploration of mine field sections.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARATION AND DEVELOPMENT OF EXTRACTION UNIT BY DIAGONAL CHAMBERS | 2019 |
|
RU2709266C1 |
METHOD FOR PREPARATION OF BEDDED DEPOSITS TO REVERSE ORDER OF MINING WHEN IMMEDIATE ROOF ROCK IS UNSTABLE | 2009 |
|
RU2398965C1 |
METHOD FOR CHAMBER MINING WHEN PREPARING HORIZONS | 2016 |
|
RU2627803C1 |
METHOD OF PREPARATION OF BEDDED DEPOSITS FOR ROOM MINING SYSTEM WITH RETREATING | 2001 |
|
RU2211332C1 |
METHOD FOR BEDDED DEPOSIT DEVELOPMENT WITH HEADING-AND-STALL METHOD | 2005 |
|
RU2303132C1 |
METHOD FOR WORKING GENTLY SLOPING AND INCLINED SEAMS OF MINERALS | 0 |
|
SU1677311A1 |
METHOD OF PREPARATION AND MINING CONTIGUOUS FLAT SEAMS | 2013 |
|
RU2530102C1 |
METHOD OF PROCESSING OF A CUTTING SITE | 2017 |
|
RU2642721C1 |
METHOD OF BLOCK PREPARATION AND PRIFILING OF THE CONTIGUOUS FLAT SYLVINITE LAYERS BY CHAMBERS | 2014 |
|
RU2552270C1 |
METHOD FOR MINING OF MINERAL GENTLY DIPPING SEAMS BY COMBINE COMPLEXES | 1992 |
|
RU2036306C1 |
Authors
Dates
2024-10-09—Published
2023-11-20—Filed