FIELD: mining.
SUBSTANCE: invention may be used to develop bedded deposits, for instance potassium ones, in case of reverse order of mining with unstable immediate roof. In process of panel preparation, tunneling combine is used to arrange one transport, two ventilation drifts and also mined slots on workable beds for the whole length of panel. Conveyor drift is tunneled with cutter-loader in sections as mining front advances. Stopes are mined on one of half-panels from conveyor drift. Transport drift is expanded by cutter-loader to section of its working element by periodic cuts, as mining front advances by the length multiple of distance between axes of stopes. During preparation of panel, ore passing wells are drilled from field conveyor drift down to design elevation of bed conveyor drift soil, and these wells are opened when conveyor drifts are tunneled on mined beds, as mining front advances. Distance between ore passing wells is selected as multiple of distance between axes of chambers.
EFFECT: invention makes it possible to significantly reduce scope of mining-preparation works required to commission the panel, and to reduce time of its preparation.
8 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARATION AND MINING CONTIGUOUS FLAT SEAMS | 2013 |
|
RU2530102C1 |
METHOD OF PREPARATION OF BEDDED DEPOSITS FOR ROOM MINING SYSTEM WITH RETREATING | 2001 |
|
RU2211332C1 |
METHOD FOR CHAMBER MINING WHEN PREPARING HORIZONS | 2016 |
|
RU2627803C1 |
METHOD FOR MINING OF MINERAL GENTLY DIPPING SEAMS BY COMBINE COMPLEXES | 1992 |
|
RU2036306C1 |
METHOD OF MINING BED MINERAL DEPOSITS | 0 |
|
SU1752957A1 |
METHOD FOR PREPARATION OF MINERAL RESOURCES DEPOSITS TO REVERSED EXTRACTION ORDER | 2003 |
|
RU2247242C1 |
METHOD FOR BEDDED DEPOSIT DEVELOPMENT WITH HEADING-AND-STALL METHOD | 2005 |
|
RU2303132C1 |
METHOD OF PREPARATION AND DEVELOPMENT OF EXTRACTION UNIT BY DIAGONAL CHAMBERS | 2019 |
|
RU2709266C1 |
METHOD OF PREPARING SEAM DEPOSITS TO CHAMBER-MINING WITH INTERMEDIATE MINERAL STORAGE | 0 |
|
SU1254158A1 |
PREPARATION METHOD OF BED DEPOSITS FOR ADVANCE MINING AT ROOM-AND-PILLAR SYSTEM | 2010 |
|
RU2435961C1 |
Authors
Dates
2010-09-10—Published
2009-02-16—Filed