FIELD: packers.
SUBSTANCE: packer comprises an eccentric fluid flow barrel having a thread at the ends and a cable conductor connected to end elements having a fluid flow channel and a channel with cable sealing means connecting the barrel cavity for guiding the cable to the annular space. Barrel for cable routing is installed inside barrel for fluid overflow. Barrel ends are inserted into channels of end elements. Ends of the shaft for fluid overflow are connected to end elements by thread having the same pitch and opposite direction of turns.
EFFECT: simplified design.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PACKER WITH CABLE ENTRY | 2020 |
|
RU2740977C1 |
HEAT-RESISTANT PACKER WITH FLOW SWITCH | 2021 |
|
RU2789645C1 |
GARIPOV WELL PUMP PACKER INSTALLATION | 2010 |
|
RU2439374C1 |
GARIPOV METHOD OF SIMULTANEOUS SEPARATE PRODUCTION OF HYDROCARBONS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2498053C1 |
PUMPING BLOCK FOR WELL OPERATION (VARIANTS) | 2004 |
|
RU2300668C2 |
METHOD AND EQUIPMENT FOR INTERVAL RESEARCH OF FORMATION PARAMETERS AT TUBES | 2016 |
|
RU2614169C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
DEVICE FOR CEMENTING TAIL IN WELL | 2005 |
|
RU2292445C1 |
DEVICE FOR CEMENTING TAIL IN WELL | 2005 |
|
RU2292444C1 |
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
Authors
Dates
2020-02-03—Published
2019-05-17—Filed