FIELD: mining.
SUBSTANCE: invention relates to mining, mainly to open-pit mining, and can be used in reclamation pit openings after open mining. Proposed method comprises separate excavation, transfer and storage of soil layer and overburden in separate belt dumps, and mining of open-pit field. After the quarry is formed, at first, the trench is made with flattening the pit openings to slopes steepness, device of water-flooded pits is created for creation of water reservoirs, for this purpose at first there is flattening of pit edges to slopes steepness of not more than 12 degrees with further planning and strengthening of pit slopes along its entire perimeter by means of device of stepped terraces of various width and length, in the form of sites with insignificant inclination towards career slope, layer of stripping rocks with thickness of at least 30 cm is laid on each of terraces, its layer is compacted, then a layer of fertile soil together with mineral fertilizers is poured thereon and seeds of perennial grasses are sown, wherein each terrace along its perimeter is cased with low-growing bushes and connecting them between each other, starting from below upwards by laying stone tracks on a pre-arranged base from a layer of compacted drainage material with thickness of not less than 15 cm and a layer of sand with thickness of not less than 7 cm, wherein the tracks themselves are laid so that each subsequent track is directed in the opposite direction from the previous one, and shore strip of water reservoir is strengthened by layer of thickness of not less than 0.6 m of construction waste in form of broken burnt brick, concrete, reinforced concrete, ceramic tiles with subsequent compaction and laying sand-gravel layer with thickness of not less than 15 cm, then sand strip is poured, besides, pointwise, in places of connection of pit slope and sand strip trees are planted along the whole perimeter of water reservoir, and free sections of the open pit are filled with a layer of fertile soil with mineral fertilizers and seeds of perennial grass. Dry, non-watered and shallow open-pit mines are laid in layer-by-layer overburden rocks, then a layer of soil ground is poured, the surface is leveled, inoculated with perennial grasses and trees and shrubs are planted.
EFFECT: providing faster recovery of disturbed lands.
1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECLAMATION OF WORKED-OUT PITS | 2010 |
|
RU2442896C1 |
METHOD FOR MINED LAND RECLAMATION | 2007 |
|
RU2325534C1 |
METHOD FOR EXHAUSTED PIT RECLAMATION | 2006 |
|
RU2310756C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448252C1 |
METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT | 2005 |
|
RU2274750C1 |
METHOD TO RECOVER ABANDONED PITS | 2010 |
|
RU2443865C1 |
RESTORATION METHOD OF DISTURBED LANDS AT OPEN DEVELOPMENT OF DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2444628C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448251C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
METHOD OF PITS CONSERVATION WITH FLOODING OF SELECTED AREA | 2010 |
|
RU2451179C1 |
Authors
Dates
2020-03-03—Published
2018-04-25—Filed