FIELD: mining, particularly reclamation of surface-mined areas in agriculture and building industry.
SUBSTANCE: method involves selectively mining, moving and accumulating ground layer and overburden in separate strip dumps; excavating open-pit field; smoothing thereof and ground layer laying. After open-pit field excavation the excavated space is filled with building waste up to high ground water layer. The building waste has composition close to that of natural minerals with different fraction dimensions. The building waste is laid in several layers each having thickness of 40-60 cm. Each layer is compacted with soil compactors or compacting mechanism. Then draining layer is laid. The draining layer is layer of gravel-sand ground with particle dimensions of not more than 200 mm and has thickness of not less than 0.6 m. The draining layer is compacted by vibratory plates. Then two parallel spiral channels are excavated along each pit perimeter from slope side. Coil of each channel starts at pit slope top and terminates at bottom thereof at upper ground water level. Both channels are filled with building waste having particle dimensions of not more than 150 mm. After that holes for trees planting are dug out, wherein the holes are arranged between channel coils. Drainage layer is located on hole bottoms so that the drainage layer is connected with building waste of the channels and holes are filled with fertile ground. Then perennial grass, bushes and trees are planted in the reclamated land.
EFFECT: reduced labor inputs and reclamation work costs, improved land protection against wind erosion and scouring.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECLAIMING TERRITORIES DAMAGED BY OPEN EXTRACTION OF DEPOSITS | 2006 |
|
RU2289695C1 |
METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT | 2005 |
|
RU2274749C1 |
METHOD FOR RECLAMATION OF WORKED-OUT PITS | 2010 |
|
RU2442896C1 |
METHOD TO RESTORE ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2529037C1 |
METHOD TO RESTORE BARROW PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2515012C1 |
RECLAMATION METHOD OF DISTURBED LANDS | 2018 |
|
RU2715768C2 |
METHOD TO RECOVER ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2011 |
|
RU2487241C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
METHOD TO RECOVER ABANDONED PITS | 2010 |
|
RU2443865C1 |
RESTORATION METHOD OF DISTURBED LANDS AT OPEN DEVELOPMENT OF DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2444628C1 |
Authors
Dates
2006-04-20—Published
2005-04-15—Filed